首页> 外文会议>Association of State Dam Safety Officials annual conference >Dodging a Bullet: Lily Lake Dam and the 2013 Colorado Flood
【24h】

Dodging a Bullet: Lily Lake Dam and the 2013 Colorado Flood

机译:躲避一颗子弹:百合湖大坝和2013年科罗拉多洪水

获取原文

摘要

This paper is about identification of high risks at a dam, multiple efforts to promptly mitigate those risks, and how the 2013 Colorado Flood severely tested those mitigation efforts. Had the National Park Service (NPS) not made major efforts to improve the safety of the dam before the event, the dam could have failed by lateral spillway erosion and head cutting, threatening the lives of people in more than two dozen homes downstream. This paper and companion presentation are to share the lessons the NPS and others learned in the areas of risk estimation/evaluation, Emergency Action Planning, environmental compliance, Early Warning System, dam repair, monitoring, event detection, incident response, and incident documentation. The paper describes the use of the Bureau of Reclamation - Small Embankment Dam Safety Guideline approach of teamwork, expert elicitation, making conservative assumptions, building consensus, and the leadership needed to move a high risk, but small dam, project forward in a timely manner to reduce confirmed high risk exposure.
机译:本文是关于识别大坝的高风险,多次努力迅速减轻这些风险,以及2013年科罗拉多洪水如何严重测试这些缓解努力。拥有国家公园服务(NPS)没有做出重大努力,在活动前提高大坝的安全,大坝可能失败了横向溢洪道侵蚀和头部切割,威胁到两次下游的两多家家中的人们。本文和同伴介绍是在风险估算/评估,紧急行动规划,环境遵从,预警系统,大坝修复,监测,事件检测,事件反应和事件文档中分享NPS和其他人的经验教训。本文介绍了填海局的使用 - 小型堤坝安全指南的配合,专家诱惑,制定保守假设,建设共识以及培养高风险,但小型大坝的领导力,以及时举行减少确认的高风险暴露。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号