Howard Hanson Dam Right Abutment Seepage: 2009 Interim Grout Curtain and Drainage Tunnel Improvements

机译:霍华德·汉森大坝右岸渗流:2009年临时灌浆帷幕和排水隧道的改进

获取原文

摘要

Observations from the January 2009 flood indicated potential piping and internal erosion in the right abutment of Howard Hanson Dam. Due to the high impact to the infrastructure downstream, it was critical to enact interim measures to reduce to risk of flooding downstream before the next flood season in November. The grout curtain and drainage tunnel improvements were designed, contracted, and constructed in a period of 6 months. Preliminary data from the monitoring being performed during the 2010 conservation pool indicates that the interim measures are performing as designed and are reducing risk of flooding downstream. Although effective, these are interim measures, and studies are ongoing to evaluate the need for additional measures.
机译:2009年1月洪水的观测结果表明,霍华德·汉森大坝的右岸有潜在的管道和内部侵蚀。由于对下游基础设施的巨大影响,至关重要的是,在11月的下一个汛期之前,采取临时措施以降低下游洪水的风险。在6个月的时间内设计,收缩和建造了灌浆帷幕和排水隧道。来自2010年保护池期间进行的监测的初步数据表明,临时措施正在按计划执行,并正在降低下游洪灾的风险。这些措施虽然有效,但却是临时措施,并且正在进行研究以评估是否需要其他措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号