首页> 外文会议>2010 2nd International Conference on Reliability, Safety Hazard >“Level-1 PSA of RAPS-2: Review of the safety of the first Indian PHWR by probabilistic method”
【24h】

“Level-1 PSA of RAPS-2: Review of the safety of the first Indian PHWR by probabilistic method”

机译:“ RAPS-2的1级PSA:通过概率方法对首台印度PHWR的安全性进行审查”

获取原文

摘要

This paper presents the tasks and insights of Level-1 PSA of Rajasthan Atomic Power Station, RAPS-2 viz. Initiating Events, Event Tree Analysis, Data Analysis and Quality Assurance program. This also brings out the strengths in design and operating experiences of the oldest IPHWR. The PSA has been carried out with plant specific data to gain insights to the overall safety of the plant. In the present analysis, the entire spectrum of fuel damage accidents has been considered with four major classes. These were further sub-divided depending on the severity of core damage. Common Cause Failures and Human reliability have also been considered. The calculated CDF indicate good operational health and adequacy of maintenance program & surveillance requirements.
机译:本文介绍了拉贾斯坦原子发电站,Raps-2 viz的1 psa的任务和洞察。启动事件,事件树分析,数据分析和质量保证程序。这也提出了最古老的IPHWR的设计和操作经验中的优势。 PSA已通过工厂特定数据进行,以了解工厂整体安全的见解。在本分析中,燃料损坏事故的整个燃料损坏事故已被考虑为四个主要课程。这些是根据核心损伤的严重程度进一步分割。还考虑了常见的原因失败和人力可靠性。计算的CDF表明了良好的运营健康和维护计划和监测要求的充分性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号