Establishing Construction - Corrective Action Program for New Nuclear Power Plants under construction in KHNP

机译:建立KHNP中正在建设的新核电厂的建设-纠正措施计划

获取原文

摘要

Effective identification and resolution of problems during all asset life cycle phases of nuclear plants, including project planning, design, procurement, construction, operation, and decommission, is one of essential keys to confirm nuclear safety and reliability. Existing e-CAP (electronic-Corrective Action Program) process of KHNP (Korea Hydro and Nuclear Power Co.) is implemented during operation phase of asset life cycle. However, KHNP's nuclear plants under construction have not used the comprehensive CAP process similar to e-CAP. During construction there are many high risk and complex activities being performed simultaneously and problems unidentified, unreported, and unevaluated can have a cascading effect during planning, design, manufacturing and construction for new nuclear power plants. Therefore, the CAP process is a critical step to assure nuclear plants are constructed in a quality manner.KHNP has developed its own C-CAP (Construction-CAP) for new nuclear power plants during construction with reference to NEI 08-02 Pl&R (Problem Identification and Resolution) and the e-CAP which was developed using INPO/WANO, NEI, and EPRI recommendations on corrective action. As a pilot, the C-CAP is being implemented in the construction of Shin-Kori units 3& 4 (APR1400) nuclear plants. Using the results of the C-CAP demonstration, this pilot C-CAP process will be extended to the units in the planning stage and currently under construction. Furthermore, KHNP is considering how to link or transfer from C-CAP to e-CAP for confirming nuclear safety and reliability during the asset life cycle. C-CAP of new nuclear power plants during construction prevents similar problems from recurring through systematic root cause analysis and corrective action according to the significance and complexity of the conditions which have an adverse effect on quality. Early problem avoidance is essential considering the number of companies and organizations involved in a construction project. Also C-CAP provides a simple process for all employees by integrating several existing processes together. Especially, through the use of a systematic database which was established through the C-CAP process; all participants can share the information of DE (Design Experience), ME (Manufacture Experience), PE (Procurement Experience) and CE (Construction Experience). C-CAP promotes continuous improvement through organizational learning and provides direction on the resolution and documentation of undesirable conditions. C-CAP process is planned and implemented with a feedback loop at the beginning of new nuclear power plants during construction. Thereby, C-CAP approach can be applied to enhance human performance and industrial safety performance as well as to improve the quality of construction activities.This paper represents KHNP's C-CAP to share our lessons learned from developing the process & system and pilot implementation, and to encourage expert feedback' comments and suggestions to improve C-CAP.
机译:在核电厂的所有资产生命周期阶段(包括项目计划,设计,采购,建造,运营和退役)中,有效地识别和解决问题是确认核安全和可靠性的重要关键之一。 KHNP(韩国水电和核电公司)的现有e-CAP(电子纠正行动计划)流程是在资产生命周期的运营阶段实施的。但是,KHNP的在建核电厂并未使用类似于e-CAP的全面CAP流程。在建造过程中,同时进行许多高风险和复杂的活动,而在新核电厂的规划,设计,制造和建造过程中,未识别,未报告和未评估的问题可能会产生连锁反应。因此,CAP过程是确保以优质方式建造核电站的关键步骤。 KHNP参照NEI 08-02 Pl&R(问题识别和解决方案)以及使用INPO / WANO,NEI和EPRI关于纠正措施的建议。作为试点,C-CAP正在建造Shin-Kori 3号和4号机组(APR1400)核电站。利用C-CAP演示的结果,该C-CAP试点过程将扩展到计划阶段和当前正在建设中的单位。此外,KHNP正在考虑如何将C-CAP链接或转移到e-CAP,以确认资产生命周期中的核安全性和可靠性。根据条件的重要性和复杂性,通过对系统进行根本原因分析和采取纠正措施,新的核电站的C-CAP可以防止在建造过程中再次发生类似的问题,而这会对质量产生不利影响。考虑到参与建设项目的公司和组织的数量,及早避免问题是至关重要的。 C-CAP还通过将几个现有流程集成在一起,为所有员工提供了一个简单的流程。特别是通过使用通过C-CAP程序建立的系统数据库;所有参与者都可以共享DE(设计经验),ME(制造经验),PE(采购经验)和CE(建筑经验)的信息。 C-CAP通过组织学习促进持续改进,并为不良条件的解决和记录提供指导。在建设过程中,在新建核电厂的开始阶段,计划并实施带有反馈回路的C-CAP过程。因此,C-CAP方法可用于提高人员绩效和工业安全绩效,并改善建筑活动的质量。 本文代表KHNP的C-CAP,分享我们从开发流程和系统以及试点实施中吸取的教训,并鼓励专家反馈意见和建议,以改善C-CAP。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号