USE OF HDPE PIPING IN THE CALLAWAY NUCLEAR PLANT ESSENTIAL SERVICE WATER SYSTEM

机译:HDPE管道在卡拉威核工厂基本供水系统中的使用

获取原文

摘要

Callaway Nuclear Plant is the first nuclear plant in the United States to utilize high density polyethylene (HDPE) piping in a nuclear safety-related application. HDPE is being installed in buried sections of the plant's ASME Section III, Class 3 Essential Service Water (ESW) system.Due to its resistance to erosion, corrosion and microbiologically induced corrosion (MIC), HDPE is well suited to raw water system applications. As with any other first of a kind project, the use of HDPE piping in the Callaway ESW system has presented challenges in all phases of the project. Design, qualification and installation considerations for thermally-fused HDPE in an ASME Class 3 system differ significantly from those for traditional metallic materials. This paper will examine the challenges and lessons learned in the design, qualification testing, installation, examination and pressure testing of the HDPE piping at Callaway Nuclear Plant.
机译:卡拉威核电站是美国第一家在核安全相关应用中使用高密度聚乙烯(HDPE)管道的核电站。 HDPE正在安装在工厂的ASME第三部分,三类基本服务用水(ESW)系统的地下区域中。 由于具有抗腐蚀,抗腐蚀和微生物诱导的腐蚀(MIC)的性能,HDPE非常适合原水系统应用。与任何其他同类项目一样,在Callaway ESW系统中使用HDPE管道在项目的所有阶段都提出了挑战。 ASME 3类系统中热熔HDPE的设计,鉴定和安装注意事项与传统金属材料的设计,鉴定和安装注意事项明显不同。本文将探讨在卡拉威核电站的HDPE管道的设计,资格测试,安装,检查和压力测试中所面临的挑战和经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号