首页> 外文会议>2010 9th IEEE/IAS International Conference on Industry Applications >Uma nova política operativa a usinas individualizadas para o planejamento da operação energética
【24h】

Uma nova política operativa a usinas individualizadas para o planejamento da operação energética

机译:针对单个工厂的新运营政策以计划能源运营

获取原文

摘要

This paper presents an operational policy for the mid term hydrothermal scheduling of the Brazilian Interconnected Power System (BIPS) based on the individual representation of the hydro and thermo power plants, the detailed representation of the plants' features and the indirect representation of the inflow stochasticity through a forecasting model. These characteristics differs the operational policy which is in use nowadays in BIPS, which is based on four interconnected subsystems represented by composite reservoirs. A simple case with a single hydro plant system was presented to evaluate the performance of the operational policy.
机译:本文根据水力和热力发电厂的个别代表,电厂特征的详细代表以及流入随机性的间接代表,提出了巴西互联发电系统(BIPS)中期水热调度的运行策略。通过预测模型。这些特征与当今BIPS中使用的操作策略不同,该操作策略基于以复合储层为代表的四个相互连接的子系统。提出了一个具有单个水力发电厂系统的简单案例,以评估运营政策的绩效。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号