首页> 外文会议>IEEE Power and Energy Society General Meeting >Lower churchill project — Multi-terminal HVdc feasibility studies
【24h】

Lower churchill project — Multi-terminal HVdc feasibility studies

机译:下丘吉尔项目—多端HVdc可行性研究

获取原文

摘要

A system integration study was undertaken to evaluate the feasibility of a three-terminal HVdc system linking Labrador, Newfoundland and New Brunswick, a component of the Lower Churchill Project. The main focus was the impact of the HVdc system on the Newfoundland Island Interconnected system, a system that is currently electrically isolated from the North American grid. The 800 MW HVdc terminal on the Island system would normally serve as an infeed of power, at times supplying nearly half of the Island load. The main technical challenge was the ac system frequency decay and transient undervoltages that resulted during the temporary loss of the HVdc infeed (due to commutation failure) coupled with a disruption of generation on the Island due to an ac system fault. Mitigation measures studied included reducing the likelihood of commutation failure of the Island HVdc converter and increasing the inertia of the Island system. Preliminary investigations of the performance of a Voltage Source Converter (VSC) HVdc terminal were also undertaken.
机译:进行了一个系统集成研究,以评估链接拉布拉多,纽芬兰和新不伦瑞克的三终端HVDC系统的可行性,该系统是下丘吉尔项目的一部分。主要重点是HVDC系统对纽芬兰岛互联系统的影响,该系统目前从北美电网电隔离。岛屿系统上的800 MW HVDC端子通常作为电力的进给,有时供应近一半的岛屿负荷。主要技术挑战是AC系统频率衰减和瞬态欠压,导致HVDC进料(由于换向故障)的临时损失,由于AC系统故障,岛上的发电中断。所研究的缓解措施包括降低岛HVDC转换器换向期的可能性,并增加岛屿系统的惯性。还进行了对电压源转换器(VSC)HVDC终端性能的初步研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号