【24h】

Representing Unique Stakeholder Perspectives in BPM Notations

机译:在BPM表示法中代表独特的利益相关者观点

获取原文

摘要

Evidence shows that proposals for new modeling notations emerge and evolution of current ones are becoming more complex, often in an attempt to satisfy the many different modeling perspectives required by each stakeholder. This paper presents a method to identify the specific notation construct requirements, at multiple levels of abstraction, which satisfy the needs of a stakeholder when performing a specific task. Initially the focus is on two different stakeholders: software engineers (SE) and business analysts(BA), and one specific software engineering activity: requirements eliciting and analysis. The specific body of knowledge of the two stakeholders (Software Engineering Book of Knowledge (SWEBOK) for the SE, and Business Analysis Body of Knowledge (BABOK) for the BA) are used to identify each stakeholder specific notation construct requirements, at multiple levels of abstraction, in order to propose a simplification of their notation and constructs set. This paper presents solution avenues to simplify business process modeling notations by identifying the specific constructs preferred by different stakeholders.
机译:有证据表明,有关新建模符号的建议应运而生,而当前建模符号的演变则变得越来越复杂,通常是为了满足每个利益相关者所需的许多不同建模观点。本文提出了一种在多个抽象级别上识别特定符号构造要求的方法,这些要求可以满足利益相关者在执行特定任务时的需求。最初,重点是两个不同的利益相关者:软件工程师(SE)和业务分析师(BA),以及一项特定的软件工程活动:需求引发和分析。两个利益相关者的特定知识体系(SE的软件工程知识手册(SWEBOK)和BA的业务分析知识体系(BABOK))用于在多个层次上识别每个利益相关者特定的符号构造要求。为了建议简化它们的符号和构造集。本文提出了通过识别不同利益相关者喜欢的特定结构来简化业务流程建模符号的解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号