Transmission lines using aluminium cable steel reinforced ground wires nearby power substations

机译:变电站附近使用铝电缆钢筋接地线的传输线

获取原文

摘要

This article shows the advantages of using transmission lines with ACSR (Aluminium Cable Steel Reinforced) ground wires in the neighbourhood of high voltage power substations. The concept of selfneutralized current is reminded in order to explain why the utilization of a double ACSR ground wire 7–20 km from the transmission line terminal substations is able to reduce up to 65% the value of the terminal substation ground mat current. It is also shown that, for power cables with metallic shielding grounded in both terminal substation ground mats, the reduction of mat current can be as large as 99.5%. The article reminds that these procuderes are already successfully used in several high voltage power substations now in operation. Some equivalent circuits are presented in order to allow a simple calculation of the value of the mat current (IM), using ACSR ground wires close to the terminal substations. It is also reminded that Steinmetz Circuit Theory has several advantages over the direct utilization of Maxwell Equations when computing A.C. transmission metallic circuits.
机译:本文显示了在高压变电站附近使用带有ACSR(铝电缆钢增强)接地线的传输线的优势。提醒人们使用自中和电流的概念,以解释为什么利用距输电线路终端变电站7-20 km的双ACSR接地线可以减少多达65%的终端变电站接地垫电流值。还显示,对于在两端变电站接地垫中接地且带有金属屏蔽的电力电缆,垫电流的减小幅度可高达99.5%。该文章提醒您,这些程序已经在目前正在运行的多个高压变电站中成功使用。提出了一些等效电路,以便使用靠近终端变电站的ACSR接地线简单地计算垫电流(IM)的值。还需要提醒的是,在计算交流输电金属电路时,与直接利用麦克斯韦方程组相比,斯坦梅茨电路理论具有许多优势。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号