首页> 外文会议>2010 International Conference on Mechanic Automation and Control Engineering >Study on constructing surveillance system of progress deviation in the key construction projects
【24h】

Study on constructing surveillance system of progress deviation in the key construction projects

机译:重点建设项目进度偏差监控系统建设研究

获取原文

摘要

Whether the key construction projects' progress is ongoing expectably or not will have important influence on the economic development. Aiming at the supervisors'(Microscopic level) insufficiency of the ability in grasping the project progress deviation, based on the balance theory, using the modern computer technology, utilizing the Delphi method and interval estimation method, the paper constructs a progress deviation surveillance system of the key construction projects in the macroscopic level(implemented by official organizations), which will provide powerful safeguard for completing these key construction projects.
机译:重点建设项目的进展是否可预期,将对经济发展产生重要影响。针对监理人员(微观层面)掌握项目进度偏差的能力不足的问题,基于平衡理论,利用现代计算机技术,运用Delphi法和区间估计法,构建了项目进度偏差监测系统。宏观一级的重点建设项目(由官方组织实施),将为完成这些重点建设项目提供有力的保障。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号