首页> 外文会议>2010 International Conference on Mechanic Automation and Control Engineering >Experimental study on a new-type concrete filled steel tubular column-slab joint subjected to low-cycle reversed horizontal load
【24h】

Experimental study on a new-type concrete filled steel tubular column-slab joint subjected to low-cycle reversed horizontal load

机译:低周反向水平荷载下新型钢管混凝土柱-平板节点的试验研究

获取原文

摘要

For resolving the difficulty that slab-column system can not be popularized in high-intensity earthquake area, a new-type concrete filled steel tubular column-slab joint is presented in this paper. The new-type joint is characterized by forming a hinge joint between the steel tubular column and the concrete flat in interior of building. And it has no use for horizontal loads, which bore completely by the concrete wall or column around the building, but only bore the vertical loads in the structure. For all that, the joint should not be destroyed badly to introduce the collapse of building after suffering a big lateral load such as strong earthquake.
机译:为解决平板地震系统在高烈度地震地区无法推广的难题,提出了一种新型的钢管混凝土柱-平板节点。新型接头的特点是在建筑物内部的钢管柱和混凝土楼板之间形成一个铰链接头。而且它对于水平荷载没有用处,水平荷载完全由建筑物周围的混凝土墙或混凝土柱承受,而仅承受结构中的垂直荷载。尽管如此,在承受较大的横向载荷(例如强地震)后,不应严重破坏接缝以引起建筑物倒塌。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号