Advanced VT3000 System Development in Pre-commission of 1000MW USC Power Unit

机译:1000MW超超临界机组预调试中的高级VT3000系统开发

获取原文

摘要

Two 1000 MW USC (Ultra Super Critical) coal fueled power units are being built in China Huaneng Jingling Power Plant now. A simulator for operator training and DCS debugging in pre-commission period is very necessary. Completely new VT3000 system development becomes a great technical challenge besides power unit modeling during this simulator project. In this paper, the reasonable architecture of VT3000 system is established after deep analysis of the characteristics of real T3000 DCS. With the incomplete DCS source data translation and supplementary coding, an automation controllers' server software package named VS7 and a human machine interface software package named VTC corresponding to real T3000 DCS are developed successfully. They form the two parts of VT3000 software system. After connected with 1000 MW USC power unit model system, the VT3000 system can meet the need of basic operator training in pre-commissioning period and provide the reference to configuration and modification of real DCS with a high practical significance.
机译:目前,中国华能晶灵电厂正在建设两座1000兆瓦超超临界燃煤电厂。在调试前需要一个用于操作员培训和DCS调试的模拟器。在此仿真器项目期间,除了功率单元建模之外,全新的VT3000系统开发还成为一项巨大的技术挑战。本文通过对真实的T3000 DCS的特点进行深入分析,建立了VT3000系统的合理架构。通过不完整的DCS源数据转换和补充编码,成功开发了与真实T3000 DCS相对应的自动化控制器的服务器软件包VS7和人机界面软件包VTC。它们构成了VT3000软件系统的两个部分。 VT3000系统与1000 MW超超临界机组模型系统连接后,可以满足调试前基础操作人员的培训需求,为实际DCS的配置和修改提供参考,具有很高的现实意义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号