PDEG-B OVERALL DESIGN AND INSTALLATION CHALLENGES

机译:PDEG-B总体设计和安装挑战

获取原文

摘要

PDEG-B was an EPIC project including three gas and three rigid oil export pipelines for the Marlim, Roncador and Barracuda fields in Campos Basin, Rio de Janeiro, Brazil. A total pipeline length of 165km and 14 tie-in structures located at the ends and along the pipelines were installed as part of the scope. Project comprised 10.75" and 12.75" API 5L X65 pipelines installed in water depths ranging from 100m to 1400m using the reeling method. Both Subsea7 reel vessels Seven Navica and Seven Oceans laid pipe in two independent installation campaigns. Installation started mid 2006 and the last pipeline section was laid down late 2007/early 2008. All pipelines were fabricated at Subsea7 spool base located in UBU, Espirito Santo, Brazil, and more than 15 trips of the pipelay vessels were necessary to complete the installation.During the engineering phase, potential for upheaval and lateral buckling was identified on the longer oil lines and potential for pipeline walking on the shorter oil line, resulting in the development of specific design mitigation measures. Furthermore, thermal expansion and free span analysis were also combined and used to assess the behavior of the free spans during the operation phase, in order to define the method and scope for free span rectification.Three of the longer lines extended from shallow to deep waters including several wall thickness transitions along their total length.The external coating of the pipelines comprised an anti-corrosion protection layer and a further thermal insulation layer was required for the oil lines. Different materials were used inused in conjunction with extensive PQT program for qualification with respect to the technical requirements and installation methods. Challenges in pipeline fabrication included planning to produce proper line pipe welding misalignment at girth welds and qualification of welding procedures for sour service.Large pipeline end and in-line subsea structures were specified for this project. PLEM's in excess of 40Te launched as 1st end directly connected to the pipeline, and ILT's weighing up to 33Te were deployed from the Seven Navica and Seven Oceans pipelay vessels, requiring reliable and field proven standards of engineering.The main objective of this paper is to provide relevant overall high level and general information on the topics mentioned above, based on the experience acquired during the project.
机译:PDEG-B是一个史诗项目,包括三个天然气和三个刚性石油出口管道,用于坎波斯盆地里约热内卢(Rio de Janeiro)的Marlim,Roncador和Barracuda领域。作为范围的一部分,安装了总位于末端和管道的165km和14个系列结构的总管线长度。项目组成10.75“和12.75”API 5L X65管道,安装在水深,使用卷轴方法从100米到1400米。 Subsea7卷轴七个纳维卡和七个海洋铺设了两个独立的安装活动。安装始于2006年中期,最后的管道部分于2007年6月至2008年初。所有管道在位于UBU,Espirito Santo,巴西的Subsea7阀芯基础上制造,并且需要超过15次船舶船只来完成安装。 。 在工程阶段,在较长的油线上识别出在更长的油线和管道上行走的较短油线上的潜力,导致特定设计缓解措施的开发,识别出升高和横向屈曲的潜力。此外,还结合了热膨胀和自由跨度分析,并用于评估在操作阶段期间自由跨度的行为,以便定义自由跨度整流的方法和范围。 从浅层到深水中的三条延伸的三条线路,包括沿其总长度的几个壁厚过渡。 管道的外涂层包括防腐蚀保护层,并且油管线需要进一步的隔热层。使用不同的材料 与技术要求和安装方法相结合使用广泛的PQT程序,以便有资格。管道制造中的挑战包括规划,在周长焊缝和焊接程序的焊接程序资格中产生适当的线管焊接不对准。 为该项目指定了大型管道端和型号海底结构。 PLEM超过140TE作为第一端直接连接到管道,并且从七个Navica和七个海洋管道船上部署了高达33个的ILT的权重,需要可靠的和现场经过验证的工程标准。 本文的主要目标是根据项目中收购的经验提供关于上述主题的相关总高水平和一般信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号