【24h】

PDEG-B PROJECT - DEEP WATER FLOWLINE DESIGN INSTALLATION

机译:PDEG-B项目-深水流线设计与安装

获取原文
获取原文并翻译 | 示例

摘要

PDEG-B was an EPIC project including three gas and three rigid oil export pipelines for the Marlim, Roncador and Barracuda fields in Campos Basin, Rio de Janeiro, Brazil. A total pipeline length of 165km and 14 tie-in structures, located at the ends and along the pipelines, were installed as part of the scope. Project comprised 10.75" and 12.75" API 5L X65 pipelines installed in water depths ranging from 100m to 1400m using the reeling method. Both Subsea7 reel vessels Seven Navica and Seven Oceans laid pipe in two independent installation campaigns. Installation started mid 2006 and the last pipeline section was laid down late 2007/early 2008. All pipelines were fabricated at Subsea7 spool base located in UBU, Espirito Santo, Brazil, and more than 15 trips of the pipelay vessels were necessary to complete the installation.rnDuring the engineering phase, potential for upheaval and lateral buckling was identified on the longer oil lines and potential for pipeline walking on the shorter oil line, resulting in the development of specific design mitigation measures. Furthermore, thermal expansion and free span analysis were also combined and used to assess the behavior of the free spans during the operation phase, in order to define the method and scope for free span rectification.rnThree of the longer lines extended from shallow to deep waters. This water depth variation and the minimum required flow rate for the oil lines resulted in the existence of several wall thickness transitions along their total length. The wall thickness variation of the pipelines had an impact on all activities like commissioning, fabrication, installation planning and overall design.rnThe external coating of the pipelines comprised an anti-corrosion protection layer and a further thermal insulation layer, required for the oil lines. Different materials were used in conjunction with extensive PQT program for qualification with respect to the technical requirements and installation methods. Pipeline welding adopted a standard J bevel for girth welding, including some planning to produce proper linepipe welding misalignment at girth welds. Linepipe specification and welding procedures were qualified for sour service.rnLarge pipeline end and in-line subsea structures (PLET's, PLEM's and ILT's) were specified for this project. PLEM's in excess of 40Te launched as 1st end directly connected to the pipeline, and ILT's weighing up to 33Te were deployed from the Seven Navica pipelay vessel, requiring reliable and field proven standards of engineering.rnThe main objective of this paper is to provide relevant overall high level and general information on the topics mentioned above, based on the experience acquired during the project.
机译:PDEG-B是一个EPIC项目,包括三条天然气和三条硬油出口管道,分别用于巴西里约热内卢坎波斯盆地的Marlim,Roncador和Barracuda油田。示波器的总长度为165公里,并在管道的末端和沿管道安装了14个连接结构。该项目包括使用绕线法将10.75“和12.75” API 5L X65管道安装在100m至1400m水深范围内。 Subsea7卷轴船Seven Navica和Seven Oceans在两次独立的安装活动中铺设了管道。安装工作于2006年中开始,最后一条管线段于2007年末/ 2008年初铺设。所有管线均在位于巴西圣埃斯皮里图市UBU的Subsea7线轴基地制造,完成安装需要超过15次行程在工程阶段,较长的输油管道上发现了潜在的剧变和横向屈曲,而较短的输油管线上则发现了管道走动的可能性,从而开发了专门的设计缓解措施。此外,还结合了热膨胀和自由跨度分析,并用于评估运行阶段的自由跨度行为,从而定义了自由跨度整流的方法和范围。rn较长的三条管线从浅水延伸到深水。水深的变化和油管所需的最小流速导致沿其总长度存在多个壁厚过渡。管道的壁厚变化会影响所有活动,例如调试,制造,安装规划和总体设计。管道的外部涂层包括防腐蚀保护层和输油管线所需的另一个隔热层。将不同的材料与广泛的PQT程序结合使用,以对技术要求和安装方法进行鉴定。管道焊接采用了标准的J坡口进行环焊,其中包括一些计划,以在环缝处产生适当的管道焊接错位。管线管的规格和焊接程序符合酸性服务的要求。rn此项目指定了大型管线末端和管道内海底结构(PLET,PLEM和ILT)。 PLEM超过40Te的第一端直接连接到管道,而ILT的重达33Te从7 Navica铺管船部署,需​​要可靠且经过现场验证的工程标准。本文的主要目的是提供相关的总体信息。根据项目中获得的经验,提供有关上述主题的高级和一般信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号