The key objective for the condition assessment of the Outfall, Relief, and 99-inch Sewers is to provide existing condition information of the pipelines to maintain reliable wastewater flow from the City of Baltimore to the Back River Wastewater Treatment Plant (WWTP). Condition assessment data was collected to develop rehabilitation and/or replacement strategies for the three large diameter pipelines.The Outfall Sewer is a 12 × 11 - foot diameter, horseshoe shaped pipeline constructed prior to 1910 conveying wastewater flow from Baltimore City to the Back River WWTP. A 10-foot diameter circular Outfall Relief Sewer was constructed in the late 1960's adding additional capacity between the Herring Run Sewer shed to the Back River WWTP. Additionally, a large diameter circular sewer conveying wastewater flow from the Eastern Avenue Pump Station force main discharge to the Outfall Sewer was assessed. Preliminary field assessments indicated flow depths at approximately fifty percent of pipe capacity and sediment depths of up to three feet within the pipelines. Due to the flow and sediment depths within the pipelines, traditional crawler type inspection equipment could not be used so the pipeline was floated.This paper will describe the condition assessment results and the work undertaken to inspect the Outfall, Relief, and 99-inch Sewers, including descriptions of the modifications made to the inspection equipment during the approximately 46,000 linear foot assessment. The results of the modifications will be discussed in more detail as well as further modifications proposed to enhance data collection capabilities.
机译:排排,救济和99英寸下水道的条件评估的关键目标是提供管道的现有条件信息,以维持从巴尔的摩市到后河废水处理厂(WWTP)的可靠的废水流。收集了条件评估数据,以制定三个大直径管道的康复和/或更换策略。 排水沟是12×11英尺的直径,马蹄形管道,在1910年之前构建,从巴尔的摩市传送到后河WWTP的废水流。 10英尺直径的圆形输出释放下水道是在1960年代后期建造的,在鲱鱼流水道上增加到后河WWTP之间的额外容量。另外,评估了从东部大道泵站力传送到排水道的大直径圆形下水道从东部大道泵站力的污水流量。初步现场评估表明流量深度大约在管道内的管材容量和沉积物深度的50%,在管道内高达三英尺。由于管道内的流动和沉积物深度,无法使用传统的履带式检查设备,因此管道浮动。 本文将描述条件评估结果和进行的工作,以检查排水口,救济和99英寸下水道,包括在大约46,000英尺的脚踏评估期间对检测设备进行的修改的描述。修改的结果将更详细地讨论,以及提出的进一步修改,以增强数据收集功能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号