首页> 外文会议>IEEE international conference on industrial engineering and engineering management;IEEM'2009 >Integrated Life-cycle Costs Analysis and Life-cycle Assessment Model for Decision Making of Construction Project
【24h】

Integrated Life-cycle Costs Analysis and Life-cycle Assessment Model for Decision Making of Construction Project

机译:建设项目决策的生命周期成本综合分析与生命周期评估模型

获取原文

摘要

With the acceleration of urbanization process and the booms in domestic infrastructure investment,the amount of civil engineering projects and infrastructures increase with years. In this context,how to lower the energy and environmental impacts of proposed project while achieving an optimization of owner's investment capitals has become a research focus with both theoretical and practical significance. Since the traditional decision-making process of construction projects solely focuses on the return of investment,this research aims to formulize a more scientific one by combining the concrete economic costs with quantitative social costs. Specific methods adopted are life-cycle costs analysis and hybrid life-cycle assessment. Result shows that the large-scale hydropower project,no matter in the aspect of lifecycle costs or in energy efficiency and environmental impact,are superior to the small-scale one.
机译:随着城市化进程的加快和国内基础设施投资的迅猛增长,土木工程项目和基础设施的数量随年增加。在这种背景下,如何降低拟建项目的能源和环境影响,同时实现业主投资资本的优化,已成为具有理论和实践意义的研究重点。由于传统的建设项目决策过程仅着眼于投资回报,因此本研究旨在通过将具体的经济成本与定量的社会成本相结合,形成一种更加科学的方法。采用的特定方法是生命周期成本分析和混合生命周期评估。结果表明,无论是在生命周期成本方面,还是在能源效率和环境影响方面,大型水电项目均优于小型水电项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号