首页> 外文会议>International foundation congress and equipment expo;IFCEE09 >A Case Study of LRFD Implementation for Static Bearing Capacity of Driven Steel Pipe Piles in Korea
【24h】

A Case Study of LRFD Implementation for Static Bearing Capacity of Driven Steel Pipe Piles in Korea

机译:LRFD在韩国驱动钢管桩静载承载力实施中的案例研究

获取原文

摘要

Resistance factors for static bearing capacity of driven steel pipe piles were calibrated in the framework of reliability theory. In order for the verification of resistance factors and the implementation of the LRFD, a case study on an actual bridge foundation designs using both the ASD and the LRFD methods is comprehensively accomplished. Detailed analysis showed that both of the design concepts gave the design bearing capacities equal to or more than the design loads. The LRFD method, however, could provide the quantitative provability of failure of the pile foundation, whereas the ASD method showed nominal level of safety.
机译:在可靠性理论的框架下,对驱动钢管桩静载承载力的阻力系数进行了标定。为了验证抗力因子并实现LRFD,全面完成了使用ASD和LRFD方法进行实际桥梁基础设计的案例研究。详细的分析表明,这两种设计概念都使设计承载力等于或大于设计载荷。然而,LRFD方法可以提供桩基础破坏的定量可证明性,而ASD方法则显示出标称的安全水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号