【24h】

MEASURING OF IMPACT FORCE AND THE CRUSH DISTANCE OF THE CYLINDRICAL SHELL IMPACTED BY MASS

机译:质量撞击圆柱壳的撞击力和压裂距离的测量

获取原文

摘要

In this paper the testing setup and testing method in the impact test of three-span pressure pipeline were introduced and discussed. In the test process a piezoelectric force sensor was tightly fixed between the missile and the mass to record the impact force. Two kinds of fixing methods were used to measure the impact force and the results acquired from different method were compared and discussed. During the impact process the variety of liquid pressure is measured by CY-YD-205 quartz pressure sensor. We also introduce the test setup and the method of the deflection testing system. Computer simulations were also carried to compare with the results of tests and to correct the error of the fixing method of load cell.
机译:本文介绍并讨论了三跨压力管道冲击试验中的测试设置和测试方法。在测试过程中,压电力传感器在导弹和质量之间紧密固定,以记录冲击力。使用两种固定方法来测量冲击力,并比较和讨论从不同方法获得的结果。在冲击过程中,通过CY-YD-205石英压传感器测量各种液体压力。我们还介绍了测试设置和偏转测试系统的方法。计算机模拟还被携带与测试结果进行比较,并纠正装载单元的定影方法的错误。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号