Risk Analysis of Construction Schedule Based on PERT and MC Simulation

机译:基于PERT和MC仿真的施工进度风险分析

获取原文

摘要

In a construction project where duration truly equals money, the management of duration is critical, thus predicting the likelihood of duration may play a key role towards project success. On the basis of the researches of other scholars, this paper analyzed the traditional probability analysis method for duration risk in program evaluation and review technique(PERT). On basis of that it simulates the projectȁ9; s duration and analyzes the risk of construction schedule by Monte Carlo simulation(MCS) method. Monte Carlo method was used to simulate the duration for each activity and the overall project to acurately determine the completion probability of the project under considering of the changeability and randomness of duration for each activity. The result shows that the MCS method is convenient, effective and efficient. It provides scientific basis for project decision-making and supports the decider powerfully.
机译:在工期真正等于金钱的建设项目中,工期的管理至关重要,因此预测工期的可能性可能对项目成功起到关键作用。在借鉴其他学者研究成果的基础上,分析了项目评价与审查技术(PERT)中持续时间风险的传统概率分析方法。在此基础上,它模拟了项目9。的工期,并通过蒙特卡洛模拟(MCS)方法分析施工进度的风险。蒙特卡罗方法用于模拟每个活动和整个项目的持续时间,从而在考虑到每个活动的持续时间的可变性和随机性的情况下准确地确定项目的完成概率。结果表明,MCS方法简便,有效,高效。它为项目决策提供科学依据,并为决策者提供有力的支持。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号