Risk Analysis of EPC Project Based on ISM

机译:基于ISM的EPC项目风险分析。

获取原文

摘要

Engineering, Procurement and Construction (EPC), is the general way for a constructor to deliver the construction or project products. According to the construction contract, the constructors conduct the project’s engineering, procurement and constructing. A number of qualitative and quantitative risk analysis methods have a current problem which is lack of systematization and strategy in risk analysis, it is necessary for EPC project to clear the relationship among different risks before risks appear because the probability of some risk may be changed if one risk event occurred. Aiming at this, Interpretive Structural Modeling (ISM) method which is the most effective solution for the problem was introduced into the risk analysis of EPC project. 11 main risks of the EPC contractors summarized via group brainstorming were assessed by ISM method. Then a Risk-Structure-Figure was set up which shows a clear relationship among the 11 risks. The conclusion is of great value to the quantitative risk analysis, such as Analytical Hierarchy Process (AHP), etc.
机译:工程,采购与建筑(EPC)是构造商交付建筑或项目产品的一般方式。根据施工合同,建设者进行项目的工程,采购和建造。目前许多定性和定量的风险分析方法都存在风险分析缺乏系统化和策略性的问题,EPC项目有必要在风险出现之前就清除不同风险之间的关系,因为如果改变某些风险的可能性,发生了一次风险事件。为此,在EPC项目的风险分析中引入了最有效的解决方案-解释性结构建模(ISM)方法。通过ISM方法评估了EPC承包商通过集体讨论总结出的11个主要风险。然后,建立了一个风险结构图,该图显示了11种风险之间的明确关系。该结论对定量风险分析具有重要价值,例如层次分析法(AHP)等。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号