首页> 外文会议>CRIOCM international symposium on advancement of construction management and real estate >Analyzing the current situation of rural building reconstruction in post disaster in Sichuan
【24h】

Analyzing the current situation of rural building reconstruction in post disaster in Sichuan

机译:四川灾后农村建筑改造现状分析

获取原文

摘要

An earthquake measured at 8.0 on the Richter scale occurred in Wenchuan district on 12th May, 2008. It is the most destructive, the most widespread and the most catastrophic seismic disaster since the founding of P.R.C. There are 1,443,800 household rural buildings to be strengthened, 1,911,700 household rural buildings and 5,735,100 rooms to be reconstructed only within the Sichuan Province. It is urgent and crucial to reconstruct the rural building, as normal life is hoped to be restored as soon as possible with limited funds. This paper analyzed, roundly and thoroughly, the current situation of post-disaster rural building reconstruction, especially on site selection, architectural forms and corresponding financing and management. Meanwhile, comprehensive analysis on restoration circumstance and progress was conducted, and suggestions were provided afterward. Through corn prehensive analysis, this paper, hopefully, helps to build up a foundation for decision making on the issue of rural building reconstruction in the future.
机译:2008年5月12日,汶川发生了里氏8.0级地震。这是自建国以来最具破坏性,最广泛,最灾难性的地震灾害。仅在四川省内,有144.38万户农村农舍得到加强,有191.17万户农村农舍得到重建和573.51万间房间被重建。重建农村建筑迫在眉睫,因为希望用有限的资金尽快恢复正常生活。本文全面,彻底地分析了灾后农村房屋重建的现状,特别是在选址,建筑形式以及相应的融资和管理方面。同时,对恢复情况和进展进行了综合分析,并提出了建议。通过玉米综合分析,有望为将来农村建筑改造问题的决策奠定基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号