This paper mainly launched assessment about the “11th Five-Year Plan” early progress towarded structural energy-saving. It also analyzed the main problem of the “11th Five-Year Plan” structural energy-saving work, and utilized GM(1,1) and other models to carry on the forecast to structural Energy-saving potential in the later period of “11th Five-Year Plan”. It pointed out that only multi-method should be utilized and structural energy-saving be attached importance to, can scheduled “11th Five-Year Plan” energy-saving goal be achieved.
展开▼