Numerical modeling of flushing process in Dez dam reservoir by HR Wallingford method

机译:HR Wallingford方法对Dez大坝水库冲洗过程的数值模拟

获取原文

摘要

Dez dam is one of the key dams in Iran. It is 203 m high with a reservoir of2.3 BCM volume. This double arch dam has been constructed in a narrow gorge in1962, southern west of Iran. It has three irrigation outlets at level of 222.7 m asl, twopower intakes at elevation of 270 m asl. No bottom outlet have been designed andinstalled for Dez dam and consequently the sediment-entering reservoir cannot beevacuated easily. Considering an annual 15.8 million cubic meter sediment inflowinto the reservoir, the bed level is increasing about 1.2 meter per year and therefore itis very necessary to take an appropriate measure saving dam reservoir.One of existing method to save dam reservoir is to flush the sediment out throughexisting bottom outlets.In this study, the feasibility and efficiency of pressure and free flow sediment flushingtechniques have been studied and some good points are presented. The results ofpresent study shows that the flushing method cannot resolve the sedimentationproblem of Dez dam and it must be applied jointly by other methods to save thereservoir from being decommissioned.
机译:德兹水坝是伊朗的主要水坝之一。高203 m,有一个水库 2.3 BCM体积。这座双拱坝是在俄罗斯的一个狭窄峡谷中建造的 1962年,在伊朗西南部。它有3个灌溉水位,海拔222.7 m,两个 海拔高度为270 m asl的动力输入口。没有设计底部出风口, 为Dez大坝安装的,因此进入泥沙的水库不能 容易疏散。考虑每年流入1580万立方米的泥沙 进入水库,床层每年增加约1.2米,因此 采取适当措施节省大坝水库是非常必要的。 保存大坝水库的现有方法之一是将沉积物冲刷通过 现有的底部网点。 在这项研究中,压力和自由流动沉积物冲洗的可行性和效率 已经研究了一些技巧,并提出了一些优点。结果 目前的研究表明,冲洗方法不能解决沉降问题 Dez大坝的问题,必须与其他方法共同应用以保存 水库不再使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号