首页> 外文会议>水工学講演会 >吉野川河道内に残留した水防竹林の管理計画に関する数値解析的検討
【24h】

吉野川河道内に残留した水防竹林の管理計画に関する数値解析的検討

机译:吉野川河道剩余的防洪竹林经营计划的数值分析

获取原文

摘要

This study is concerned with a management plan of riverine bamboo groves which used to play an important role of flood protection but have been neglected in a river course after levee construction. The study site is a river channel between Tachino and Kamo on the right and left sides, respectively, and located in an upstream reach of the Yoshino River in Shikoku, Japan. A numerical model of two-dimensional shallow water flow was composed by taking account of form drag of bamboo bodies and influence of secondary flow on bed shear stress. This model was validated based on an observation results of surface velocity of an actual flood flow and was utilized to clarify the variation of river flow due to reduction of area and population density of bamboo forests. As a result, useful information was obtained for drawing up a reasonable bamboo grove management plan.
机译:这项研究涉及河流竹林的管理计划,该计划曾经在防洪中起着重要的作用,但是在堤坝建设后的河道中却被忽略了。研究地点位于日本四国的吉野川上游,分别位于T野和鸭友之间的一条河道,位于左右两边。考虑竹体的形变阻力和二次水流对床切应力的影响,建立了二维浅水流数值模型。该模型基于实际洪水流量的表面速度观测结果进行了验证,并用于阐明由于竹林面积和人口密度减少而引起的河流流量变化。结果,获得了有用的信息来制定合理的竹林管理计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号