GIBE II TUNNEL PROJECT-ETHIOPIA: 40 BARS OF MUD ACTING ON THE TBM 'SPECIAL DESIGNS AND MEASURES IMPLEMENTED TO FACE ONE OF THE MOST DIFFICULT EVENTS IN THE HISTORY OF TUNNELING'

机译:GIBE II隧道项目-埃塞俄比亚:40吨泥浆作用于TBM'针对隧道历史上最困难的事件之一采取的特殊设计和措施

获取原文

摘要

In October 2006, a 7m Double Shield TBM, boring through very poor volcanic formations, was pushed back by fluid mud, which presence had not been detected during previous field investigations, due to the high covers characterizing the majority of the tunnel axis.The present work describes the investigations made to gain better knowledge of the conditions in front and all around the TBM, the special measures implemented, the exploratory and bypass tunnels excavated, the extraordinary occurrences came true during the execution of these tunnels, the drainage campaigns, the design of the chamber excavated to free the TBM, the dismounting and restarting of the TBM.
机译:2006年10月,一个7m的Double Shield TBM钻进了非常贫瘠的火山岩层,被流体泥浆推回,在以前的田野调查中,由于大部分隧道轴线都具有高覆盖层,因此没有在现场进行勘测。 本工作描述了为更好地了解TBM前方和周围情况,进行的特殊措施,探索性和旁路性隧道的开挖,在执行这些隧道期间发生的特殊事件,排水运动,开挖的腔室设计可释放TBM,拆卸和重新启动TBM。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号