首页> 外文会议>International conference on construction real estate management >AHP-Based Weighting Factors Affecting Electrical Safety on Construction Sites
【24h】

AHP-Based Weighting Factors Affecting Electrical Safety on Construction Sites

机译:基于AHP的加权因素会影响施工现场的电气安全

获取原文

摘要

According to statistical data from 1990 to 1999, electronic shock accident accounts for 18% and is second highest among all casualty accidents in China. Compared to developed countries, such as America, the number of casualty and its proportion is much higher. So there is a big room for improvement with respect to temporary electrical safety of construction sites. Before taking measure, risk identification and factor weighting is necessary. AHP method is often used in the course of risk assessment in construction industry. It is a mature mathematical disposal of expert’s subjective estimation. This paper studies the application of AHP method to elicit knowledge from experts and formalize it into a set of weighted safety factors. It will help construction manager to improve construction safety.
机译:根据1990年至1999年的统计数据,电击事故占18%,在中国所有人员伤亡事故中排名第二。与美国等发达国家相比,伤亡人数及其所占比例要高得多。因此,在建筑工地的临时用电安全方面还有很大的改进余地。在采取措施之前,必须进行风险识别和因素加权。在建筑行业的风险评估过程中经常采用层次分析法。这是专家主观评估的成熟数学方法。本文研究了AHP方法在从专家那里获取知识并将其形式化为一组加权安全因子的应用。这将有助于施工经理提高施工安全性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号