【24h】

Research on Modeling the Project Configuration Problem with Resource Constraints

机译:资源约束下的项目配置问题建模研究

获取原文

摘要

In this paper,we study the project configuration problem under resource constraints.We present a new modeling framework based on multi-mode resource-constrained project scheduling for configuring the project subject to explicit resource constraints.It establishes a bridge between the areas of project scheduling and project design.Our model is also able to handle additional practical issues such as quality level requirements and general temporal constraints,which are often encountered in the real world.A constraint programming (CP) based solution approach is proposed and implemented in our case study.Conclusions and future research directions are discussed.
机译:本文研究了资源约束下的项目配置问题。提出了一种基于多模式资源受限项目调度的建模框架,用于在资源受限的情况下对项目进行配置。在项目调度领域之间架起了一座桥梁。我们的模型还能够处理现实世界中经常遇到的其他实际问题,例如质量水平要求和一般时间约束。在我们的案例研究中提出并实现了基于约束编程(CP)的解决方案。结论和未来的研究方向进行了讨论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号