【24h】

Water level behavior evaluation in upstream tailing dam

机译:尾矿坝上游水位行为评价

获取原文

摘要

Among the main building methods of railings dams,the upstream method is undoubtedly the most vulnerable to the occurrence of the failure originated by the power of seepage groundwater through the embankment. In a reservoir-dam system having low cohesion slimes,such as tailings dams,the power of seepage groundwater benefits the installation of internal erosive processes of piping and liquefaction,the most responsible for the failure already registered. For reduction of failure risks in tailings dams built through upstream method,the assessment of water level behavior must be constant. In this context,the survey presents an instrumental and monitored program composed by piezometer,rainy,downstream outlet,reservoff level of water measures and benchmark providing the increase of safety in these works.The execution of a methodological procedure based on the instrumental and monitored program above mentioned makes possible the assessment of water level behavior in these dams. Relevant aspects for correlation of instrumental data with the limit-values defined for the project are described,meaningful criterion for the success of an instrumental program. Therefore,the methodological procedure showed efficiency in the obtain of indispensable patterns for the water level variation accompaniment and its behavior forecast according to the embankment foundation.
机译:在栏杆大坝的主要建造方法中,上游方法无疑是最容易发生由堤坝渗漏地下水的力量引起的破坏的方法。在尾矿坝等粘性低的粘泥的水库大坝系统中,渗漏地下水的力量有利于管道和液化的内部侵蚀过程的安装,这是已经发生的故障的最主要原因。为了减少通过上游方法建造的尾矿坝的破坏风险,水位行为的评估必须是恒定的。在这种情况下,调查提出了一个仪器和监测程序,该程序由测压仪,雨水,下游出口,水措施的蓄水位和基准组成,从而增加了这些工程的安全性。基于仪器和监测程序的方法学程序的执行以上提到的这些使得评估这些大坝的水位行为成为可能。描述了仪器数据与为项目定义的极限值相关的相关方面,这是仪器程序成功的有意义的标准。因此,根据路堤基础,该方法程序显示出在获得水位变化伴奏及其行为预测中必不可少的模式方面的效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号