首页> 外文期刊>SBB Steel Markets Daily >Vale to decommission all upstream tailings dams
【24h】

Vale to decommission all upstream tailings dams

机译:Vale到退役所有上游尾矿坝

获取原文
获取原文并翻译 | 示例
           

摘要

Brazilian mining group Vale is to decommission all of its upstream tailings dams and has presented its plans to do so to the Brazilian authorities after the fatal collapse of the Córrego de Feij?o iron ore mine No. 1 tailings dam in Minas Gerais last Friday, the company said Tuesday. Last Friday's disaster killed at least 65 people and has left nearly 300 people unaccounted for, with most of them feared buried in the mud that spewed from the waste dam.
机译:巴西矿业集团谷是将所有上游尾矿大坝停用,并提出了在Córregodefeij的致命崩溃后向巴西当局这样做的计划,而不是去年星期五Minas Gerais的尾矿大坝。 该公司周二表示。 上周五的灾难至少杀死了65人,并且已经留下了近300人,因为他们中的大多数人都害怕埋在泥土中淹没的泥土。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号