首页> 外文会议>Improving infrastructure worldwide >External Post-Tensioning Retrofit and High- and Low-Cycle Fatigue Study ofConnections and Joints in Steel-Concrete Box-Girder Bridges
【24h】

External Post-Tensioning Retrofit and High- and Low-Cycle Fatigue Study ofConnections and Joints in Steel-Concrete Box-Girder Bridges

机译:钢-箱形箱梁桥连接处的外部张后改造及高低周疲劳研究

获取原文

摘要

This paper reports the study of a viaduct retrofit by means of external post-tensioning. The structureis a steel-concrete box-girder bridge and the retrofit has been necessary mainly owing to anadvanced corrosion state which has affected the structural steel of the boxes. During the design twosolutions have been conceived: I) cables with a parabolic development; ii) cables with a rectilineardevelopment. The advantages and the drawbacks of these solutions designed by S.I.GE.S s.a.s. arehere presented. In parallel with this problem, an on going study is being carried out on the: ⅰ)dynamic regime in order to identify the sensitive details; ⅱ) validation of the Finite Element (FE)model by means of output-only ambient vibration tests; ⅲ) optimization and physical testing of thecritical details. This study is devoted to improve both the high- and low-cycle fatigue strength insteel-concrete box-girder bridges and the results achieved so far are here reported.
机译:本文报道了通过外部后张紧对高架桥进行改造的研究。结构 是一座钢混凝土箱梁桥,主要由于 腐蚀状态严重,影响了箱子的结构钢。在设计二 已经提出了解决方案:I)抛物线形的电缆; ii)直线电缆 发展。 S.I.GE.S s.a.s.设计的这些解决方案的优缺点是 这里介绍。与此问题并行的是,正在对以下内容进行研究: 动态机制以识别敏感细节; ⅱ)有限元(FE)的验证 通过仅输出的环境振动测试进行建模; ⅲ)的优化和物理测试 重要细节。这项研究致力于改善高周疲劳和低周疲劳强度。 此处报道了钢混凝土箱梁桥和迄今取得的成果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号