首页> 外文会议>2007高层建筑火灾情况下电梯疏散国际研讨会(the 2007 International Symposium on Elrvator Evacuation during High-rise Fires)论文集 >The Application of Preliminary Hazard Analysis in the Inspection of Danger Factors of Elevator Type Parking Equipment
【24h】

The Application of Preliminary Hazard Analysis in the Inspection of Danger Factors of Elevator Type Parking Equipment

机译:初步危害分析在电梯式停车设备危险因素检测中的应用

获取原文

摘要

The security inspection is an important part for securing the normal operation of elevator type parking equipment. During the process of operation test of elevator type parking equipment,preliminary hazard analysis method can be used to give a preliminary analysis to the security condition of operation test, and furthermore, give an appraisement to its criticality. This method will offer a new way for preventing accidents, developing regulations of inspection operations.
机译:安全检查是确保电梯式停车设备正常运行的重要部分。在电梯式停车设备运行试验过程中,可以采用初步的危害分析方法对运行试验的安全状况进行初步分析,并对其危害程度进行评价。该方法将为预防事故,制定检查操作规定提供新的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号