首页> 外文会议>亚洲太平洋地区爆破技术研讨会 >Reduction Measures of Blast Vibration on Adit Passes at Lanjian Iron-ore Pit
【24h】

Reduction Measures of Blast Vibration on Adit Passes at Lanjian Iron-ore Pit

机译:蓝尖铁矿坑平整通道爆破振动的减轻措施

获取原文

摘要

The influence of blast vibration gives prominence to a safety of adit passes when bench mining is going down. After theoretical analysis and field tests hole-to-hole millisecond (MS) delay blasting, two-in-hole MS delay blasting, two-in-hole and hole-to-hole MS delay combined blasting have been practiced to reduce blast vibration. The effect of reduction measures is obvious and adit passes have been protected efficiently.
机译:台风开采下降时,爆炸振动的影响突出了通道通过的安全性。经过理论分析和现场测试后,对孔眼毫秒延迟爆破,两孔MS延迟爆破,两孔和孔对MS延迟联合爆破进行了实践,以减少爆炸振动。减少措施的效果是显而易见的,并且通行证得到了有效的保护。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号