首页> 外文会议>European rotorcraft forum;ERF33 >FLIGHT TESTING OF PIONEER BRIDGES AS HELICOPTER SLUNG LOADS USING A CH-53G
【24h】

FLIGHT TESTING OF PIONEER BRIDGES AS HELICOPTER SLUNG LOADS USING A CH-53G

机译:使用CH-53G对作为吊挂直升机的先锋桥进行的飞行测试

获取原文

摘要

Mobile pioneer bridges of different types were transported as helicopter slung loads in a test campaign in order to identify safe flight envelopes, handling qualities as well as practical handling instructions. The German Federal Armed Forces intend to standardize and to establish procedures of the external load transportation of pioneer bridges. Tests were carried out by means of a 20to CH-53G medium lift transport helicopter in close cooperation of the Wehrtechnische Dienststelle 61 (WTD 61, the German Armed Forces Technical and Airworthiness Center for Aircraft and Aeronautical Equipment), the Wehrtechnische Dienststelle 51 (WTD 51, German Armed Forces Technical Center for Pioneer and Troop Equipment) and the DLR (German Aerospace Center), where preparatory activities have been conducted by simulation in advance [1]. The paper will discuss test preparations and results.
机译:在一次测试活动中,将各种类型的移动式先驱桥作为直升机的吊重物进行运输,以识别安全的飞行包线,装卸质量以及实用的装卸说明。德国联邦武装部队打算标准化并建立先驱桥梁的外部负载运输程序。在Wehrtechnische Dienststelle 61(WTD 61,德国武装部队飞机和航空设备技术和适航中心),Wehrtechnische Dienststelle 51(WTD 51)的密切配合下,使用20至CH-53G中升运输直升机进行测试,德国武装部队先驱与部队装备技术中心和DLR(德国航空航天中心),事先已通过模拟进行了准备活动[1]。本文将讨论测试准备和结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号