Remediation and Stabilization of Slopes Exhibiting Acidic Water Runoff

机译:倾斜和稳定倾斜呈现酸性水径流的斜坡

获取原文

摘要

The objective of this experiment was to find a cost effective, durable solution for the remediation and stabilization of sites producing Acid Rock Drainage (ARD). A barrier layer of PennzSuppress D~? is an integral part of the system as it prevents wash-off of neutralizer before it has effectively treated the acid and mineral pollution caused by pyrite weathering. The efficiency of the barrier coating with three different neutralization strategies was tested to find the most effective combination. Each test site of approximately 93 square meters (1,000 square feet) has comparable conditions, including contamination amount and type, environmental exposure, application, grade and geology. The treatment types are: 1. Penn State Slurry, barrier coating, compost, seed, mulch 2. Magnesium Oxide, barrier coating, compost, seed, mulch 3. Calcium Carbonate, barrier coating, compost, seed, mulch 4. No neutralizer, barrier coating, compost, seed, mulch 5. No neutralizer, barrier coating, seed, mulch Treatment types 1, 2, 3 and 4 were used for the experiment performed in State College, Pennsylvania at an area of I-99 construction adjacent to Route 322. During a preliminary test in Lewistown PA, (about 56 kilometers (35 miles) south of State College) treatment types 4 and 5 were used. The objective of the preliminary test was to determine the need for the compost and to demonstrate the use of this technology as a sealant and promoter of vegetative growth on pyrite contaminated or erosion prone areas. Buffering capacity for each neutralizer type was determined and used when calculating the application rate. Laboratory tests were done to confirm the neutralizer treatment amounts and their compatibility with the barrier layer. For ease of application and efficiency, the process was designed to allow all neutralizers, the barrier layer and seeds to be applied utilizing a hydro-seeder truck and spray applicator. The compost was applied with a blower to obtain the height needed due to the grade of the slope. Application of calcium carbonate, barrier material, compost, seed and mulch in a layered manner has been shown in this experiment to effectively treat acid effluent from exposed iron pyrite. This technology has the potential to effectively treat immovable areas of exposed iron pyrite and marcellus shale, ARD, waste coal piles, coal mine run-off, erosion prone slopes, and vegetation resistant areas.
机译:该实验的目的是寻找具有生产酸岩排水(ARD)的地点的修复和稳定性的成本效益,耐用的解决方案。 pennzsuppress d〜?是系统的一个组成部分,因为它可以在有效地处理黄铁矿风格引起的酸和矿物质污染之前,它是防止中性剂的洗脱。测试了具有三种不同中和策略的阻隔涂层的效率,以找到最有效的组合。每个测试站点约为93平方米(1000平方英尺)具有可比条件,包括污染量和类型,环境暴露,应用,等级和地质。治疗类型是:1。宾州浆液,屏障涂层,堆肥,种子,覆盖橡胶2.氧化镁,屏障涂层,堆肥,种子,覆盖物3.碳酸钙,屏障涂层,堆肥,种子,覆盖物4.没有中性剂,屏障涂层,堆肥,种子,覆盖物5.没有中和剂,屏障涂层,种子,覆盖物治疗类型1,2,3和4用于在宾夕法尼亚州的宾夕法尼亚州的宾夕法尼亚州的宾夕法尼亚州邻近路线附近的区域进行322.在Lewistown PA的初步测试期间,(大约56公里(35英里)的南部南部的国家学院)使用4和5种。初步测试的目的是确定对堆肥的需求,并证明这种技术的使用作为硫铁矿污染或侵蚀易发区域的植物生长的密封剂和启动子。在计算施用速率时确定并使用每个中和剂类型的缓冲能力。完成实验室测试以确认中和剂处理量及其与阻挡层的相容性。为了便于应用和效率,该过程旨在允许所有中和器,屏障层和种子利用水力播种车和喷雾涂抹器应用。堆肥用鼓风机应用,以获得由于斜坡等级而所需的高度。在该实验中显示了碳酸钙,阻隔材料,堆肥,种子和覆盖物的应用,以有效地从暴露的铁黄铁矿处理酸流出物。该技术有可能有效地治疗暴露铁黄铁矿和Marcellus页岩,ARD,废煤桩,煤矿径流,腐蚀易于斜坡和植被抗性地区的不动产区域。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号