BENEFICIAL USE OF DREDGED MATERIALS AT LOUISIANA SHORELINE NEAR SABINE PASS

机译:在Sabine通行证附近的路易斯安那海岸线的有益用途

获取原文

摘要

Cheniere Sabine Pass Liquefied Natural Gas (SPLNG) Terminal is located 12 miles west of Johnson Bayou, Louisiana, on the Louisiana side of the Sabine Pass Channel. The construction of the Terminal will require the removal of approximately ±4.5 million cubic yards (CY) of mostly virgin soil from the proposed marine berth. The removal of the soil was conducted via a 36-inch hydraulic dredger. Due to the quantity of the dredged material, it is required under Louisiana regulations to utilize the dredged material for beneficial uses, and a decision was made to use the materials for beach nourishment along the shoreline east of Sabine Pass Jetty. The plan included pumping the dredged material south via dredge piping to Louisiana Point and then discharging the material into offshore waters about 2,200-feet (ft) from the Louisiana shoreline in depths ranging from 5 to 8 ft deep. The discharged material is expected to provide wave buffers, increased wildlife and aquatic habitat and act as a barrier to protect the existing shoreline from continued erosion. A two-dimensional hydrodynamic (RMA2) and sediment transport (SED2D) modeling effort was conducted to investigate the transport of the discharged material and its potential effects on the environment. Significant data collection effort, including bathymetric survey, geotechnical studies, current measurements, wind and tide data collection, and water quality sampling, was conducted to support the modeling effort. The bathymetric survey included a 3-mi by 2-mi (6-sq-mi) area surrounding the proposed beneficial use site and the East Jetty Boat Cut area to verify the relative elevation differences between the Boat Cut and the surrounding area. Available navigational charts were used to expand the RMA2 and SED2D models significantly beyond the field survey boundary to allow for sediment transport simulations of a larger area. The data were then used to develop a 2D mesh for RMA2 and SED2D models. The finished mesh has a total of 16,970 nodes and 5,559 elements. The modeling results were presented to federal and state agencies to support the application of necessary permits for the project. As a result, the project has been permitted and construction is ongoing. This paper provides a summary of the modeling effort and the status of the dredged materials placement effort.
机译:Cheniere萨宾帕斯液化天然气(SPLNG)码头位于西河口约翰逊,路易斯安那州12英里,在萨宾帕斯通道的路易斯安那州的一面。终端的建设将需要提出的海洋泊位删除了大约±4500000立方码(CY)大部分的原始土壤。土壤的去除通过一个36英寸的液压挖泥船进行。由于疏浚材料的数量,它是在路易斯安那州的法规要求利用用于有益用途的疏浚物,并且作出决定,使用材料一起萨宾帕斯码头岸线东海滩的滋养。该计划包括通过疏通管道路易斯安那点泵送疏浚材料南,然后在深度范围从5到深8英尺材料排入近海水域有关从路易斯安那海岸线2200英尺(ft)。出料预计将提供波缓冲区,提高野生动物和水生栖息地,并作为保护现有岸线从不断侵蚀的屏障。二维流体动力学(RMA2)和输沙(SED2D)建模工作旨在探讨排放材料的运输及其对环境的潜在影响。显著数据收集工作,包括水深测量,岩土研究,电流测量,风和潮汐数据的收集和水质采样,进行了支持建模工作。的测深调查包括一个3-MI 2-MI(6- SQ-MI)周围所提出的有益使用位点和东方码头乘船剪切区域以验证船剪切和周围区域之间的相对高度差的区域。可用的导航图被用来扩大RMA2和SED2D模型显著超越了实地调查边界允许更大面积的输沙模拟。然后这些数据被用来建立一个二维网格为RMA2和SED2D模型。成品网具有总16970个节点和5559个元素。建模结果提交给联邦和州政府机构,以支持该项目所需的许可证的申请。其结果是,该项目已被允许和建设正在进行中。本文提供了建模工作和疏浚物安置工作的状态的总结。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号