Romanian experience on the decommissioning of nuclear facilities

机译:罗马尼亚在核设施退役方面的经验

获取原文

摘要

Like many countries, Romania has started the decommissioning of small nuclear andradiological facilities as well as the decommissioning of research reactors. The regulatory framework fordecommissioning as well as decommissioning licensing process in Romania are briefly described. The mainregulations on decommissioning issued by regulatory authority either in force or in planning are presented. Thepaper describes the content of the technical documentation for getting the decommissioning license, andcontentand format of the decommissioning plan to be prepared and submitted by operator. The decommissioninglicenses issued until now as well as a description of decommissioning activities in Romania are presented. As anexample the decommissioning activities at MultiZonal Research Reactor located on Pitesti site are presented.The paper described, also, the major problems met during the regulatory review of the 6 editions ofdecommissioning plan for the WWR-S research reactor and the progress made in the implementation ofdecommissioning activities. The WWR-S research reactor located on Magurele site is now in permanent shutdown state under the preservation and clean up license.
机译:像许多国家一样,罗马尼亚已经开始退役的小核和 放射设备以及研究堆的退役。监管框架 简要描述了罗马尼亚的退役以及退役​​许可进程。主要的 提出了监管机构的退役条例,以在于生效或规划。这 纸张介绍了用于获得退役许可证的技术文档的内容,andContent 和运营商提交的退役计划的格式。退役 颁发牌照签发的许可证以及罗马尼亚退役活动的描述。作为A. 示例介绍了位于PTESTI位点的多张研究反应器的退役活动。 本文描述了,此外,在6版的监管审查期间遇到了主要问题 WWR-S研究反应堆的退役计划和实施中的进展 退役活动。位于Magurele网站上的WWR-S研究反应器现在永久关闭 保存和清理许可下的州下的州。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号