Lessons learnt from application of the standardized cost calculation code OMEGA indecision making processes and planning in decommissioning

机译:从应用标准化成本计算代码OMEGA决策过程和退役计划中获得的经验教训

获取原文
获取外文期刊封面目录资料

摘要

Implementation of the standardised cost structure, as defined in "A Proposed StandardisedList of Costs Items for Decommissioning Purposes" (OECD/NEA, IAEA, EC, 1999), into the decommissioningcosting, supports the harmonisation of decommissioning costs. The decision making processes indecommissioning planning can be more effective if there is the possibility to compare the calculated data withthe data of other projects, structured in standardised cost structure. The results of the decision making processshould be based on evaluation of such a set of decommissioning options which covers the methods ofdecommissioning, the selected strategy and existing or planned decommissioning infrastructure. Aspects such asimpact of time, waste management scenarios, uncertainties of input data and other aspects should be alsoevaluated. These issues of decision making process were implemented into the decommissioning costing codeOMEGA. All activities of a decommissioning project are involved within single compact standardisedcalculation structure including waste management. The resulting costs have standardised format and noadditional data conversion is needed. The calculation process is nuclide resolved and internally linked in such away that it models the material and radioactivity flow in the decommissioning process. The effect of decay ofradioactivity is considered. The options are optimised in the standard MS-Project software as Gantt charts. Thebi-directional data link between the standardised calculation structure and the Gantt chart supports the on-lineoptimisation of the Gantt chart structure. Multi-option work is applied, I.e. decommissioning options, whichcover all decommissioning scenarios to be considered, are evaluated individually and multi-attribute analysis isapplied for selecting the optimal one. Methods of sensitivity analysis and evaluation of uncertainties ofcalculated costs were developed for support the decision making process and for definition of contingencies.
机译:实施标准化成本结构,如“拟议标准化”中所定义 用于退役的成本项目清单”(OECD / NEA,IAEA,EC,1999年) 成本核算,支持退役成本的统一。的决策过程 如果可以将计算出的数据与 其他项目的数据,以标准化的成本结构进行结构化。决策过程的结果 应基于对这套退役方案的评估,其中涵盖了 退役,所选策略以及现有或计划中的退役基础设施。诸如 时间的影响,废物管理方案,输入数据的不确定性和其他方面也应 评估。这些决策过程问题已纳入退役成本核算代码中 欧米茄。退役项目的所有活动都包含在单个紧凑型标准化中 计算结构,包括废物管理。由此产生的成本具有标准化格式,并且没有 需要额外的数据转换。计算过程是通过核素分解并在这种情况下内部链接的 在退役过程中对物料和放射性流进行建模的方式。衰变的影响 考虑放射性。这些选项在标准MS-Project软件中作为甘特图进行了优化。这 标准化计算结构和甘特图之间的双向数据链接支持在线 优化甘特图结构。应用多选项工作,即退役选择 涵盖要考虑的所有退役方案,分别进行评估并进行多属性分析 申请选择最佳之一。敏感性分析和不确定度评估的方法 计算出的成本用于支持决策过程和意外事件的定义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号