Some issues relevant to the development of the Armenian NPP decommissioning plan

机译:与制定亚美尼亚核电厂退役计划有关的一些问题

获取原文

摘要

In this paper, an attempt was made to describe the decommissioning options and estimate theircosts for the decision-makers selection. The preferable option that was obtained as the result of the work carried outby both the USA PNLL and the TACIS SOGIN was SAFSTOR/DECON (II). The cost of that option for the ANPPdecommissioning is also comparable with the costs of the decommissioning of other nuclear units in the countriesoperating the same type of reactors.The purpose of the development of the decommissioning plan is to identify and evaluate feasible decommissioningoptions for the Armenian NPP (ANPP). So, the purpose of this plan is both to select a preferred option, and toprovide data and information needed by decision-makers. Relevant work has been carried out since 2000 in theframe of the USA DOE and TACTS programs. The work has been implemented by foreign experts and Armenianspecialists. During program implementation, some important activities have been completed. Much more additionalinformation will be needed before final decisions can be made. During the evaluation of alternatives, specific optionswere clearly identified as being much more feasible from an economic standpoint and so some alternatives are notrecommended to be carried forward.The ANPP consists of two power units of WWER-440 (V-270 project) type of reactors having design life-time of 30years. Unit 1 of the ANPP was put into operation on 22nd December 1976, Unit 2 - on 5th January 1980. During the1988 Spitak earthquake, the power units of the ANPP remained in operation. Although all the ANPP equipment, aswell as the protection and control systems continued their stable and safe operation, the Council of Ministers of theUSSR made a decision to shut the ANPP down, and the power units were stopped in Spring of 1989 without anyappropriate decommissioning plan. In April 1993, the Government of Armenia made a decision to restart Unit 2 ofthe ANPP aiming at overcoming the energy crisis broken out after the country had gained its independence. Unit 2 ofthe ANPP was re-commissioned in November 1995 and has been in operation up to now. Unit 1 has remained in astand-still regime since its shutdown. To perform the decommissioning of both power units separately is impossiblebecause the two reactors share one reactor building.Three fundamental issues were discussed and evaluated during the development of the decommissioning plan:? Decontamination and decommissioning of the ANPP systems and structures;? Long-term management of spent nuclear fuel;? Long-term management of liquid and solid radioactive waste.
机译:本文尝试描述退役方案并估算其方案 决策者选择的费用。工作进行后获得的最佳选择 由美国PNLL和TACIS SOGIN共同编写的是SAFSTOR / DECON(II)。对于ANPP,该选项的成本 退役也可与该国其他核装置的退役费用相提并论 运行相同类型的反应堆。 制定退役计划的目的是确定和评估可行的退役 亚美尼亚核电厂(ANPP)的选项。因此,该计划的目的是选择一个首选选项,并 提供决策者所需的数据和信息。自2000年以来,在 美国DOE和TACTS计划的框架。这项工作已经由外国专家和亚美尼亚人执行 专家。在方案执行期间,一些重要的活动已经完成。更多更多 在做出最终决定之前,将需要信息。在评估替代方案期间,具体方案 从经济的角度来看,显然被确定为是可行得多的,因此一些替代方案没有 建议结转。 ANPP由WWER-440(V-270项目)型电抗器的两个功率单元组成,设计寿命为30 年。 ANPP的1号机组已于1976年12月22日投入运营,而2号机组已于1980年1月5日投入运营。 1988年的Spitak地震中,ANPP的动力装置仍在运行。虽然所有的ANPP设备都一样 以及保护和控制系统继续稳定,安全地运作, 苏联决定关闭ANPP,动力装置于1989年春季停运,没有任何动静。 适当的退役计划。 1993年4月,亚美尼亚政府作出决定,重启亚美尼亚第2单元。 旨在克服国家独立后爆发的能源危机的ANPP。第2单元 ANPP于1995年11月重新投入运行,至今仍在运行。第1单元保留在 自停工以来一直处于停滞状态。不可能分别对两个动力装置进行退役 因为两个反应堆共享一个反应堆建筑物。 在制定退役计划期间讨论并评估了三个基本问题: ? ANPP系统和结构的去污和退役; ?乏核燃料的长期管理; ?液体和固体放射性废物的长期管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号