首页> 外文会议>Lessons Learned From the Decommissioning of Nuclear Facilities and the Safe Termination of Nuclear Activities >Lessons learned from the decommissioning of the Saxton nuclear experimentalcorporation facility
【24h】

Lessons learned from the decommissioning of the Saxton nuclear experimentalcorporation facility

机译:萨克斯顿核试验公司设施退役的经验教训

获取原文

摘要

The Saxton Nuclear Experimental Corporation (SNEC) Facility, a 23.5 MWt reactor, operatedfrom 1962 to 1972. From 1972 to 1974 it was partially decontaminated and placed in a storage condition. By themid-1980's a decision was made to complete the decontamination and demolition of Saxton support structures.Appropriate structural maintenance of these support structures during the shutdown period could have extendedtheir life. This lesson learned has direct applicability to owners of other shutdown facilities. The SNEC supportfacility decontamination project occurred during 1987 to 1989. NRC regulatory practice at that time was toperform a 100% confirmatory survey following submittal of the licensee's final survey report. This process tookseveral years and building demolition took place in 1992. Since that time NRC rules and practices have changedsuch that decommissioning activities can be accomplished more efficiently. In 1995 the owners made a decisionto complete the decommissioning of the remainder of the facility which included the steel containment vessel(CV) which housed the nuclear system components. A site characterization plan was developed and performedbased on the remaining nuclear related structures. In 1998, based on published guidance from the NRC, aHistorical Site Assessment (HAS) was performed which indicated that the adjacent coal-fired facility, which hadbeen demolished in 1975, had also been impacted by SNEC Facility operations. Surveys taken in this areadiscovered radiological contamination above site release limits. This discovery added considerable scope andcost to the project. The key lesson is to perform an HAS in order to more accurately define project scope beforehand. The SNEC Facility decommissioning project was a milestone in the current United Statesdecommissioning process and these and other lessons learned from SNEC have direct applicability to otherfacilities.
机译:萨克斯顿核实验公司(SNEC)设施,一个23.5 MWt反应堆,正在运行 从1962年到1972年。从1972年到1974年,它被部分净化并置于储存状态。由 1980年代中期,决定完成对Saxton支撑结构的除污和拆除工作。 在停工期间对这些支撑结构进行适当的结构维护可能会延长 他们的生活。所学到的教训可直接应用于其他关机设施的所有者。 SNEC支持 设施净化工程于1987年至1989年进行。当时NRC的监管做法是 在提交被许可人的最终调查报告后,执行100%的确认性调查。这个过程花了 几年的时间,1992年进行了建筑物拆除。从那时起,NRC的规则和做法发生了变化 这样可以更有效地完成退役活动。 1995年,业主做出决定 完成对设施的其余部分的退役,包括钢制安全壳 (CV),其中装有核系统组件。制定并执行了场地表征计划 基于剩余的核相关结构。 1998年,根据NRC发布的指南, 进行了历史遗址评估(HAS),该评估表明邻近的燃煤设施 1975年被拆除,也受到了SNEC设施运营的影响。在这一领域进行的调查 发现超出现场释放限制的放射性污染。这一发现增加了可观的范围,并且 项目成本。关键课程是执行HAS,以便在此之前更准确地定义项目范围 手。 SNEC设施退役项目是当前美国的一个里程碑 退役过程以及从SNEC获得的这些以及其他经验教训对其他方法都有直接的适用性 设施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号