WESTMINSTER DRIVE UNDERPASS - ACCELERATED BRIDGE CONSTRUCTION USING GIGO (GET IN-GET OUT) BRIDGE CONCEPT

机译:威斯敏斯特驱动地下通道 - 加速桥梁施工使用吉胶(进出出来)桥概念

获取原文

摘要

The Ministry of Transportation Ontario (MTO), in partnership with consultants and contractors, developed a method for accelerated bridge construction called Get in-Get out Bridge or GiGo Bridge. The GiGo Bridge concept is an Accelerated Bridge Construction (ABC) technique for replacing bridges over freeways, in 45 days or less, with a full closure of the crossing road. The concept requires that bridge components be prefabricated in advance of the on-site work. This has the advantage of shifting a substantial portion of the work into the winter months, freeing up staff resources and equipment for the summer months. Additional benefits of GiGo Bridge include shorter disruptions to traffic as well as enhanced safety, since workers have less contact with traffic during the project. In 2014, the Westminster Drive Underpass on Highway 401 in London, Ontario, was successfully replaced using the GiGo Bridge concept. The new, two-span integral abutment bridge consists of a number of prefabricated elements, including precast concrete abutments, wingwalls, and pier cap; and steel box girders. However, the accelerated bridge construction feature that is of primary interest in this project, and that is key to the GiGo Bridge concept, is the use of 6 prefabricated, 95-tonne supermodules, each of which consists of a steel box girder with a cast-in-place concrete deck. Based on the success and lessons learned from the Westminster Drive project, MTO will be using the GiGo Bridge concept on other projects, including the replacement of the Highway 401/Highway 19 Underpass in Ingersoll in 2017.
机译:与顾问和承包商合作的交通运输部开发了一种加速桥梁建设的方法,称为进出桥或千兆桥。 Gigo桥梁概念是一种加速桥梁建筑(ABC)技术,用于更换高速公路,45天或更短的桥梁,完全关闭过横道。该概念要求在现场工作之前预先制定桥接组件。这具有将大部分工作转移到冬季,避开夏季的员工资源和设备的优势。 Gigo Bridge的额外福利包括对流量的更短的破坏以及增强的安全性,因为工人在项目期间的流量较少。 2014年,在安大略省伦敦401号高速公路的威斯敏斯特驱动地下通道成功地替换了Gigo桥概念。新的两跨度整体基台桥包括许多预制元件,包括预制混凝土基台,翼墙和码头帽;和钢箱梁。然而,在这个项目中主要兴趣的加速桥梁施工特征,这是Gigo桥梁概念的关键,是使用6个预制的95吨超模码,每个超模块由铸造的钢箱梁组成-in-place混凝土甲板。根据从威斯敏斯特驱动项目中吸取的成功和经验教训,MTO将在其他项目上使用Gigo桥梁概念,包括更换401英尺/高速公路19次地下通道2017年的底层。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号