首页> 外文会议>Canadian Society for Civil Engineering annual conference >DEVELOPMENT OF METRICS TO EVALUATE DISABILITY MANAGEMENT AND SAFETY PERFORMANCE IN THE CONSTRUCTION INDUSTRY
【24h】

DEVELOPMENT OF METRICS TO EVALUATE DISABILITY MANAGEMENT AND SAFETY PERFORMANCE IN THE CONSTRUCTION INDUSTRY

机译:指标的发展,以评估建筑业残疾管理与安全性能的指标

获取原文

摘要

The risk of a major injury or fatality in the construction industry is two and a half times and five times higher respectively than that in the manufacturing industry. The resulting costs of injuries and fatalities in the form of productivity losses, workers' compensation insurance and other direct and indirect costs affect the profitability of construction organizations. This reinforces the need for effective health and safety disability management (DM) and the need to quantify safety and disability management performance. A research study has been initiated by the University of Manitoba Construction Engineering and Management Group and funded by the Workers' Compensation Board of Manitoba (WCB) for that purpose. The study aims more specifically to evaluate DM in the construction industry and its relation to safety performance using leading and lagging indicators of performance. This paper reports on the methodology used to measure safety and DM performance using lagging performance indicators or metrics. The research entailed reviewing the literature to identify the most important metrics used to evaluate safety and DM performance in construction and collecting those for ten Manitoban construction companies with the help of these companies, the Construction Safety Association of Manitoba and SAFE Manitoba. The indicator developed include communication practices, case management practices, return to work practices, claims management, disability and injury prevention practices, transition program practices, physical accessibility practices, senior management support, program evaluation practices, regulatory and compliance polices, retention polices and ergonomic practices. The resulting data will be analyzed and correlated with the data derived from the use of a maturity model developed to evaluate these organizations' DM performance using leading indicators of performance. This research makes the case for the need to better integrate disabled workers in the construction workplace to improve the safety of the overall organization. It also aims to justify further investments in DM to ensure related practices effectively accommodate disabled workers on site and in the field.
机译:建筑业主要伤害或致命的风险分别比制造业的两倍半,分别比制造业更高五倍。由生产率损失的形式,工人补偿保险和其他直接和间接成本的伤害和死亡的成本影响建设组织的盈利能力。这加强了有效的健康和安全残疾人管理(DM)以及量化安全和残疾管理表现的必要性。曼尼托巴省大学建筑工程与管理集团发起了一项研究研究,并由工人赔偿委员会(WCB)为此目的进行了资金。该研究更具体地旨在评估建筑业的DM及其与滞后性能指标的安全性能关系。本文有关使用滞后性能指标或指标来测量安全性和DM性能的方法。该研究需要审查文献,以确定用于评估建筑安全性和DM性能的最重要的指标,并在这些公司的帮助下,曼尼托巴省建筑安全协会和曼尼托巴省的建筑安全协会收集十大英国武士建筑公司。该指标包括通信实践,案例管理实践,返回工作实践,索赔管理,残疾和伤害预防实践,转换方案实践,身体访问,高级管理支持,方案评估实践,监管和合规政策,保留策略和人体工程学实践。将分析生成的数据并与使用从开发的到期模型的使用来分析和相关数据,这些数据使用前导性能指标评估这些组织的DM性能。本研究使案件有必要更好地将残疾人队伍中的施工工作场所整合,以提高整个组织的安全。它还旨在证明DM的进一步投资,以确保相关做法有效地容纳现场和现场的残疾工人。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号