Nubbin Slough and Taylor Creek Stormwater Treatment Areas – PostConstruction Report

机译:努宾斯劳和泰勒河雨水处理区–施工后报告

获取原文

摘要

Nubbin Slough and Taylor Creek Stormwater Treatment Areas (STAs) were designed in 2003 andconstructed in 2005 and 2006 as part of the Lake Okeechobee Critical Project for reducing phosphoruslevels in tributary streams. Both projects utilize pump stations to convey water from their respectivestreams to distribution channels on the high side of constructed wetlands, manage the flow through thewetlands by automated water control gates, then provide outlet control to return the treated water to thestreams a short distance above Lake Okeechobee. Natural processes within the constructed wetlands willabsorb and adsorb phosphorus, binding it to organic material and soil particles that will remain with theSTA. Nutrient concentrations will be monitored upstream and downstream of the treatment areas.Detention times, pumping rates, discharge rates, and water depth will be controlled to provide maximumreduction of phosphorus from the streams. The project was sponsored by the Corps of Engineers,Jacksonville District, and South Florida Water Management District. The phosphorus removal process wasmodeled by Dr. Robert Knight, Wetland Solutions, Inc. The facilities were designed by StanleyConsultants, Inc.Construction of the two areas has been completed and the startup period has begun. During this phase, theSTAs will be brought to design water levels so that preferred emergent vegetation can become establishedand some of the operation guidelines can be developed. This report will describe the site conditions of thetwo STAs before and immediately after construction, discuss the lessons that were learned during designand construction, and illustrate some of the benefits the project has returned to date.
机译:Nubbin Slough和Taylor Creek雨水处理区(STAs)于2003年设计, 作为奥基乔比湖关键项目的一部分于2005年和2006年建造的,用于减少磷 支流中的水位。这两个项目都利用泵站从各自的水源输送水 流到人工湿地高处的分配通道,控制流过人工湿地的流量 湿地通过自动水控制闸门,然后提供出口控制,以将处理后的水返回到 流过奥基乔比湖上方一小段距离。人工湿地内的自然过程将 吸收和吸收磷,将其结合到有机物质和土壤颗粒中,并与磷一起保留 STA。营养浓度将在治疗区域的上游和下游进行监测。 滞留时间,抽水率,排出率和水深将受到控制,以提供最大的 减少溪流中的磷。该项目是由工程兵团赞助的, 杰克逊维尔区和南佛罗里达水管理区。除磷过程是 由Wetland Solutions,Inc.的Robert Knight博士建模。这些设施由Stanley设计 顾问公司 这两个区域的建设已经完成,启动期已经开始。在此阶段, 将使STAs达到设计水位,以便可以建立首选的紧急植被 并且可以制定一些操作准则。该报告将描述 在施工之前和之后的两个STA,讨论在设计过程中吸取的教训 和施工,并说明该项目迄今已带来的一些好处。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号