首页> 外文会议>World environmental and water resources congress >Phase I of the Kissimmee River Restoration Project: Initial River ChannelResponses
【24h】

Phase I of the Kissimmee River Restoration Project: Initial River ChannelResponses

机译:基西米河修复工程的第一阶段:初始河道响应

获取原文

摘要

Completed in 2001, Phase I of the Kissimmee River Restoration Project (KRRP)backfilled 12 km of the C-38 flood control canal, restoring flow to over 24 km of historicriver channel. The goal of KRRP is reestablishment of ecological integrity to theriver/floodplain ecosystem. Ultimately, the project is expected to restore 50 km~2 offloodplain wetlands and over 70 km of river channel. This paper reports on predicted andmeasured responses in seven river channel metrics. Monitoring focused on before-aftermeasurements of physical and biological components of the river channel, includinghydrology, geomorphology, dissolved oxygen, vegetation, invertebrates, fish, and birds.Preliminary results for these metrics show that they have followed the predicteddirections of recovery, and in some cases have already met project expectations.
机译:基西米河整治工程(KRRP)一期工程于2001年完成 回填了C-38防洪渠的12公里,恢复了超过24公里的历史流量 河道。 KRRP的目标是重新建立生态系统的完整性。 河流/洪泛区生态系统。最终,该项目有望恢复50 km〜2 洪泛区湿地和超过70公里的河道。本文报告了预测和 在七个河道指标中测得的响应监控重点放在前后 测量河道的物理和生物组成部分,包括 水文,地貌,溶解氧,植被,无脊椎动物,鱼类和鸟类。 这些指标的初步结果表明,它们已遵循预期 恢复的方向,在某些情况下已经达到了项目预期。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号