首页> 外文会议>Software Engineering >USING USE CASE MODELS TO GENERATE OBJECT POINTS
【24h】

USING USE CASE MODELS TO GENERATE OBJECT POINTS

机译:使用用例模型生成对象点

获取原文

摘要

Project managers are required to provide size and effort estimates at several milestones throughout the software development life cycle (SDLC), which is most challenging in the early stages when no detailed information is readily available about the project. Object points (OPs) is one of the size metrics that can be used the early prototyping stages of software development. Use case (UC) elicitation and modeling technique has been extensively used, despite its deficiencies, to model and specify system requirements and system prototypes. A UC meta-model is proposed to overcome most of the UC model's deficiencies. Project managers will now be supported with a new method that utilizes the proposed UC meta-model so as to bridge the gap between UC models and the OPs counting technique. This method automatically counts the system OPs from UC models at early stages of the SDLC. Finally, the initial quantitative results of this method confirm our hypothesis which believes that the more detailed a UC model is, the more accurate the derived OPs count.
机译:项目经理需要在整个软件开发生命周期(SDLC)的几个里程碑中提供规模和工作量估算,这在早期阶段是极具挑战性的,因为目前尚无有关该项目的详细信息。对象点(OP)是可以在软件开发的原型开发早期阶段使用的大小指标之一。尽管存在用例(UC)启发和建模技术,但尽管如此,它仍被广泛用于对系统需求和系统原型进行建模和指定。提出了UC元模型来克服UC模型的大多数缺陷。现在将为项目经理提供一种新方法的支持,该方法利用建议的UC元模型,以弥合UC模型和OP计数技术之间的差距。此方法在SDLC的早期阶段自动计算UC模型中的系统OP。最后,这种方法的初始定量结果证实了我们的假设,即,UC模型越详细,得出的OP计数越准确。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号