DEERFOOT TRAIL EXTENSION-MANAGING RUNOFF TO PROTECT THE BOW RIVER

机译:DEERFOOT足迹延伸管理径流保护弓河

获取原文

摘要

The Deerfoot Trail Extension is 11 km of new freeway which was opened to traffic Nov.28th, 2003. The project cost $100M, and extends south from Hwy 22X to the existing Hwy 2 / 2Ainterchange south of Calgary. This completes a previously missing direct link in Hwy 2, which is part ofthe North / South trade corridor through Alberta.This project resulted in new twin bridges across the Bow River. The Bow River is rated as one of the topsix fly fishing rivers in North America. This, along with the design team's desire to "raise the bar" for thisproject resulted in the first Alberta provincial highway project to incorporate a storm drainage system thatcaptures all highway runoff from the bridges, and 2 km of hwy to the south, and carries it to a two stagesedimentation pond. Here, a minimum 85% of sediment is removed from the run-off before flowing to aninfiltration gallery in adjacent granular soils. The system is designed so that overflows (above designstorm event) from the infiltration gallery would enter the intermittent Pine Creek, which meanders for over1 km before entering the Bow River.The sedimentation pond is designed with a central weir which captures the majority of the sediment, andmakes periodic pond cleaning more efficient. The outfall structure is designed to remove water frombottom levels of the pond, thereby allowing any hydrocarbon spills to stay in the pond by floating on thesurface until they can be cleaned up.A similar drainage system was designed by other consultants to capture runoff from Deerfoot Trail north ofthe Bow River.The project also included several other noteworthy environmental mitigations, including:1. Alignment shift 130m west to miss Bow River side channel2. Re-alignment of Pine Creek to restore creek-bed lost under Deerfoot trail embankment3. 4m × 7m × 85m wildlife underpass complete with median sky-light4. 2.4m high wildlife fencing from the Bow River south for 2 km5. "Wildlife Impediments" at ends of fence to prevent animals "end-running"6. Plantings to create new protected wildlife corridors along both sides of Deerfoot Trail embankmentfrom Bow River to south escarpment7. Lengthened Bow River bridges to provide 30m "dry" wildlife corridors along both sides of the Bow river8. Development of first ECO Plans (Environmental Construction Operations) for Alberta Transportationprojects, to manage and minimize sediment escaping into Pine Creek and Bow River during road andbridge construction.
机译:Deerfoot Trail延伸段是11月新通车的11公里高速公路。 2003年2月28日。该项目耗资1亿美元,从22X高速公路向南延伸到现有的2 / 2A高速公路 在卡尔加里以南的立交桥。这样就完成了高速公路2中以前缺少的直接链接,该链接是 穿过艾伯塔省的北/南贸易走廊。 该项目产生了横跨弓河的新双桥。弓河被评为顶级之一 北美有六条飞蝇钓河。这,以及设计团队为此的“提高标准”的愿望 该项目导致了阿尔伯塔省的第一个省级公路项目纳入了雨水排放系统, 捕获桥梁中的所有高速公路径流,以及向南行驶2公里的高速公路,并将其分为两个阶段 沉淀池。在这里,至少有85%的沉淀物从径流中去除后才流到 邻近颗粒土壤中的渗透通道。该系统经过精心设计,可以溢出(超出设计 暴风雨事件)从渗透廊进入间歇性的松溪,蜿蜒流过 进入弓河之前1公里。 沉淀池设计有一个中央堰,该堰可捕获大部分沉积物,并且 使定期池塘清洁更加有效。排污口设计用于清除水 池塘的底部,从而使任何碳氢化合物溢出物通过漂浮在池塘的底部而留在池塘中 直到可以清理为止。 其他顾问设计了一个类似的排水系统,以捕获来自北面Deerfoot Trail的径流。 弓河。 该项目还包括其他一些值得注意的环境缓解措施,包括: 1.路线向西移动130m,错过Bow River侧航道 2.重新调整Pine Creek以恢复Deerfoot小路堤下失去的小河床 3. 4m×7m×85m野生动物地下通道,中间有天窗 4.从弓河以南2.4公里高的野生动物围栏2公里 5.栅栏末端的“野生动物障碍”,以防止动物“奔跑” 6.沿Deerfoot Trail路堤两侧种植新的受保护的野生动物走廊 从弓河到南悬崖 7.加长的弓河大桥,在弓河两岸提供30m“干燥”的野生动物走廊 8.制定阿尔伯塔省交通运输的第一个ECO计划(环境建设运营) 项目,以管理并最大程度地减少公路和公路运输过程中进入松溪和弓河的沉积物 桥梁建设。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号