EARLY HISTORY OF THE BOW RIVER IRRIGATION PROJECT, ANDCONSEQUENCES OF DESIGN ERRORS

机译:弓河灌溉工程的早期历史及设计失误的后果

获取原文

摘要

The Bow River Irrigation Project was first conceived in 1903, and a formal agency, theSouthern Alberta Land Company was formed in 1906 to proceed with planning. There were severalproposals for the location and layout of the project, but the final decision on location and choice for agravity supply system was not made until 1909. In order to mollify shareholders for this delay, and in spiteof a minimum of pre-planning and engineering expertise, a massive construction program was undertakenin 1910. A series of failures developed, starting in 1911, forcing the resignation of the Chief Engineer in1912. The lost time and money due to these failures was fateful, because world events in the next 4decades mitigated against a recovery from the bad start. By 1950 only 18% of the initial objective hadbeen achieved. The project was taken over by the federal government of Canada in 1949, andsubsequently turned over to the provincial government of Alberta in 1974. The input of capital andengineering expertise provided by the governments converted the project to a viable entity, 80%developed by 2000.
机译:鲍河灌溉工程始于1903年,当时是一个正式机构, 南部艾伯塔省土地公司成立于1906年,以进行规划。有几个 有关项目位置和布局的建议,但最终决定权取决于项目的位置和选择 直到1909年才建立起重力供应系统。 在最少的规划和工程专业知识的基础上,进行了大规模的建设计划 在1910年。从1911年开始出现了一系列失败,迫使总工程师辞职。 1912年。由于这些失败而造成的时间和金钱损失是命运的决定,因为在接下来的4年中发生了世界大事 几十年来,由于从糟糕的开始中恢复过来,缓解了。到1950年,只有18%的最初目标 实现了。该项目于1949年由加拿大联邦政府接管, 1974年移交给艾伯塔省政府。 政府提供的工程专业知识将项目转化为可行的实体,占80% 于2000年开发。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号