It has been determined that the City of Saskatoon's existing raw water intake and pumpingfacilities on the South Saskatchewan River, which are shared with Sask Power Corporation at the QueenElizabeth Power Station, cannot be further expanded effectively. Associated Engineering (AE) werecommissioned to undertake a study to locate and assess the feasibility of constructing a new raw waterintake system on the river that is capable of supplying the City's long-term raw water needs.northwest hydraulic consultants (nhc) were retained by AE in early 2001 to conduct an intake feasibilitystudy of seven potential locations. Following site selection, nhc were further retained by AE in August2003 to conduct river engineering services and physical hydraulic model studies for the proposed rawwater intake and pumping facilities to ensure satisfactory hydraulic performance over its expected lifespan.nhc are currently assisting AE with the intake design to ensure that the structure will be suitable from botha hydraulics and fisheries perspective. Furthermore, nhc are providing guidance in determining the preciselocation of the intake structure so that it remains operational over the expected lifespan. A mobile bed riverphysical model has been constructed and will be utilized to ensure satisfactory performance of theproposed geometric configuration for the intake structure. In addition, physical modelling of the proposedpump sump structure will determine if its initial configuration provides adequate approach hydraulics anduniform flow distribution to the pumps during all modes of operation will be conducted once the design ofthe intake structure has been finalized.This purpose of the poster presentation (without an accompanying paper) will be to present the keycomponents of the overall study from site selection to recommended design modifications for bothphysical model studies. It is anticipated that a majority of the key components for this particular study willhave been completed by June 2004. Information from the river engineering assessment and results fromthe physical hydraulic model studies will be discussed and illustrated in detail in the poster presentation.
机译:已确定萨斯卡通市现有的原水取水量和抽水量 萨斯喀彻温省南部河上的设施,与女王萨斯电力公司共享 伊丽莎白发电站,无法进一步有效扩展。联合工程(AE) 受委托进行一项研究,以找到并评估建造新原水的可行性 河流上的取水系统能够满足纽约市的长期原水需求。 AE在2001年初聘请了西北液压顾问(nhc)进行进水可行性 研究七个潜在的位置。选址之后,NHC在8月被AE进一步保留 2003年为拟议的原始资料进行河流工程服务和物理水力模型研究 取水和抽水设施,以确保在其预期的使用寿命内具有令人满意的水力性能。 nhc目前正在协助AE进行进气设计,以确保两种结构都适合AE 从水力学和渔业的角度来看。此外,NHC正在提供确定精确度的指导 进气结构的位置,以使其在预期的使用寿命内保持运行状态。流动河床 已经建立了物理模型,并将用于确保模型的令人满意的性能。 提出了进气结构的几何构型。另外,建议的物理建模 泵油底壳结构将确定其初始配置是否提供足够的进近液压系统,以及 一旦进行了以下设计,就将在所有操作模式下对泵进行均匀的流量分配: 进气口结构已完成。 海报展示的目的(无随附文件)将是展示钥匙的方法 总体研究的组成部分,从选址到建议的设计修改 物理模型研究。可以预期,这项特定研究的大多数关键要素将 截止2004年6月。河流工程评估的信息和结果 物理水力模型研究将在海报展示中详细讨论和说明。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号