【24h】

Wind power in power generation planning

机译:风力发电规划

获取原文

摘要

Wind energy applications are rapidly increasing in power generating systems due to widespread public support for renewable energy. Wind energy, however, has not been considered as an important factor in capacity planning since wind penetration has traditionally been insignificant compared to conventional generation. It will be increasingly important to consider wind energy in generation planning as wind penetration continues to increase. It is difficult to assign a capacity credit to a wind turbine generator since its actual capacity is limited by the random variation of the wind speed and the turbine characteristics. Capacity planning considering wind power requires realistic cost/reliability evaluation techniques that respond to the inherent random variables. This paper presents an evaluation model and applies it to a test system to illustrate the influence of different factors on generation planning.
机译:由于公众对可再生能源的广泛支持,风力发电在发电系统中的应用正在迅速增加。然而,风能一直未被认为是容量规划中的重要因素,因为与传统发电相比,传统上风能的渗透率微不足道。随着风的普及率不断提高,在发电规划中考虑风能将变得越来越重要。由于风力涡轮发电机的实际容量受到风速和涡轮特性的随机变化的限制,因此很难为风力涡轮发电机分配容量信用。考虑风能的容量规划需要现实的成本/可靠性评估技术,以响应固有的随机变量。本文提出了一种评估模型,并将其应用于测试系统,以说明不同因素对发电计划的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号