Multi-plan formulation of hydropower generation considering uncertainty of wind power

机译:考虑风电不确定性的水力发电多计划制定

获取原文
获取原文并翻译 | 示例
           

摘要

Being driven by wind, which has the characteristics of intermittency, the output power of a wind farm is fluctuating and difficult to forecast accurately, which imposes higher requirements on the schedule of the power system. In this paper, the fluctuation characteristics of wind power during the adjacent time interval is accurately captured through statistical analysis of the historical data of the wind farm. Then, a two-layer nested model for a hydro-wind complementary system is formulated to improve the guidance for the daily generation scheduling. In the outer layer, load distribution schemes for each station are determined using the heuristic successive cutting load method. In the inner layer, the water consumption tolerance is introduced so that the original inner model is modified into a multi-plan model of in-station economic operation, which is solved with the multi-plan solution of the dynamic programming method. A cascade hydropower station located in Qing River of China is chosen for a detailed case study. The operational results indicate the following: (1) In hydro-wind complementary system, the water consumption tolerance of a hydropower station based on the fluctuation distribution of wind power is adaptable to wind power uncertainty; (2) Using the multi-plan solution of the dynamic programming method, the optimal scheduling of the load distribution of a hydropower station based on water consumption tolerance provides a larger decision-making space for economic operation of the hydropower station; (3) The adjustable range of unit is related to the range of water head, output, and vibration zone of the hydropower station. A small change in water consumption can bring about a large change in the adjustable range; (4) The daily generation scheduling considering the adjustable range of unit can reserve the adjustment margin of the unit before the implementation of the plan, reduce the number of times the unit passes through the vibration zone during actual operation, and enhance the stability of the unit and the applicability of the daily generation plan, so as to be more adaptable to the uncertainty of wind power and decrease the impact of the uncertainty of wind power on the grid.
机译:风电场具有间歇性,受风的驱动,其输出功率波动较大,难以准确预测,对电力系统的调度提出了更高的要求。通过对风电场历史数据的统计分析,可以准确地捕获相邻时间间隔内风电的波动特征。然后,为水电互补系统建立了两层嵌套模型,以改善对日发电计划的指导。在外层,使用启发式连续切削负荷法确定每个工位的负荷分配方案。在内部层中,引入了耗水公差,从而将原始内部模型修改为站内经济运行的多计划模型,并通过动态规划方法的多计划解决方案解决了该问题。详细案例研究选择了位于中国清河的梯级水电站。运行结果表明:(1)在水电互补系统中,基于风电波动分布的水电站水耗容差适应风电不确定性。 (2)采用动态规划法的多方案解决方案,基于耗水量公差的水电站负荷分配优化调度,为水电站经济运行提供了较大的决策空间; (3)机组的可调范围与水电站水头,出水口,振动区的范围有关。耗水量的微小变化可在可调范围内带来较大的变化; (4)考虑机组可调范围的日发电计划,可以在计划实施前预留机组的调整余量,减少机组实际运行中通过振动区的次数,提高机组的稳定性。单位和日常发电计划的适用性,从而更适应风电的不确定性,减少风电不确定性对电网的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号