【24h】

Determining the cost of uncertainty to electric utilities in serving highly varying loads

机译:确定为电力行业带来很大不确定性的成本

获取原文

摘要

In those cases where load fluctuations are small, a utility or independent system operator (ISO) may not incur significant costs in meeting these loads. In contrast, a utility confronted with large load variations due to industrial customers can experience significant costs in order to maintain system parameters. Therefore, highly varying load (HVL), containing uncertain components which are observable in short-term and realtime operations, generally results in the incremental cost in order for the electric utility to meet its customer demand without compromising electric power quality and reliability. The purpose of this study is to present a framework for measuring costs of uncertainty by considering system control and financial market functions and decisions in parallel with any activity that a utility anticipates HVL. The methods for cost measurement are also provided in order to assess the impacts of HVL in terms of costs of uncertainty in short-term and real-time operations.
机译:在负载波动较小的情况下,公用事业公司或独立系统运营商(ISO)可能不会为满足这些负载而招致重大成本。相比之下,由于工业客户而导致负载变化很大的公用事业公司,为了维护系统参数,可能要付出高昂的成本。因此,包含短期和实时运行中可观察到的不确定组件的高变化负载(HVL)通常会导致成本增加,以便电力公司在不损害电力质量和可靠性的情况下满足其客户需求。这项研究的目的是通过考虑系统控制和金融市场功能以及与公用事业公司预期的HVL活动同时进行的决策,来提供一种测量不确定性成本的框架。还提供了成本计量方法,以便就短期和实时运营中的不确定性成本评估HVL的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号